Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Capgemini America Inc › Delivery Manager 4

Delivery Manager 4 aig Capgemini America Inc: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Delivery Manager 4 aig Capgemini America Inc. Tuarastal bunasach meadhanach $217,914; leth meadhanach $209,310–$227,192.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$217,914
Leath mheadhanach nan tuarastalan$209,310–$227,192
Ceudail 10mh–90mh$199,649–$256,474

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$216,798
FY20254$214,164
FY20262$247,228

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$220,000
Ìre IV
Cincinnati, OH14 Cèit 202619 Cèit 2026Dearbhaichte
$274,456
Ìre IV
San Francisco, CA8 Faoi 202623 Faoi 2026Dearbhaichte
$217,914
Ìre IV
Dearborn, MI13 Ògmh 20251 Dàmh 2025Dearbhaichte
$217,914
Ìre IV
Dearborn, MI3 Ògmh 20251 Dàmh 2025Dearbhaichte
$206,000
Ìre IV
Sparks, NV25 Gearr 202510 Màrt 2025Dearbhaichte, an uair sin air a tharraing air ais
$210,413
Ìre IV
Suwanee, GA27 Dùbh 202431 Dùbh 2024Dearbhaichte
$248,768
Ìre IV
San Francisco, CA30 Ògmh 202310 Iuch 2023Dearbhaichte
$184,829
Ìre IV
Chicago, IL29 Samh 20225 Dùbh 2022Dearbhaichte

Obraichean eile aig Capgemini America Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).