Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › CDM Smith Inc. › Environmental Engineer 5

Environmental Engineer 5 aig CDM Smith Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Environmental Engineer 5 aig CDM Smith Inc.. Tuarastal bunasach meadhanach $120,879; leth meadhanach $115,357–$126,198.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$120,879
Leath mheadhanach nan tuarastalan$115,357–$126,198
Ceudail 10mh–90mh$107,344–$133,846

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20264$120,879

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$102,003
Ìre IV
El Paso, TX15 Gibl 202610 Cèit 2026Dearbhaichte
$138,944
Ìre IV
Houston, TX9 Gibl 202610 Cèit 2026Dearbhaichte
$119,808
Ìre IV
Cincinnati, OH9 Gibl 202610 Cèit 2026Dearbhaichte
$102,003
Ìre IV
El Paso, TX9 Gibl 202610 Cèit 2026Air a tharraing air ais
$121,950
Ìre IV
Dallas, TX6 Samh 20251 Dùbh 2025Dearbhaichte

Obraichean eile aig CDM Smith Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).