Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Charles Schwab & Company, Inc. › Sr. Manager, Security Development & Engineering Lead

Sr. Manager, Security Development & Engineering Lead aig Charles Schwab & Company, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Manager, Security Development & Engineering Lead aig Charles Schwab & Company, Inc.. Tuarastal bunasach meadhanach $178,523; leth meadhanach $176,751–$187,142.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$178,523
Leath mheadhanach nan tuarastalan$176,751–$187,142
Ceudail 10mh–90mh$175,700–$211,477

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$175,876
FY20241$227,700
FY20251$178,523
FY20261$187,142

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$187,142
Ìre IV
Austin, TX8 Ògmh 20262 Dàmh 2026Dearbhaichte
$178,523
Ìre IV
Phoenix, AZ18 Sult 202511 Màrt 2026Dearbhaichte
$227,700
Ìre IV
Phoenix, AZ16 Gearr 202415 Lùna 2024Dearbhaichte
$175,000
Ìre III
Austin, TX13 Sult 20232 Dàmh 2023Dearbhaichte
$176,751
Ìre IV
Austin, TX2 Lùna 202315 Faoi 2024Dearbhaichte

Obraichean eile aig Charles Schwab & Company, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).