Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Charter Communications, Inc. › Advanced Video Engineer IV

Advanced Video Engineer IV aig Charter Communications, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Advanced Video Engineer IV aig Charter Communications, Inc.. Tuarastal bunasach meadhanach $116,563; leth meadhanach $112,798–$117,021.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$116,563
Leath mheadhanach nan tuarastalan$112,798–$117,021
Ceudail 10mh–90mh$111,804–$125,220

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$116,563
FY20241$112,798
FY20253$117,021

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$130,686–$156,530
Ìre IV
Greenwood Village, CO18 Ògmh 202524 Samh 2025Dearbhaichte
$111,142–$156,530Greenwood Village, CO28 Gibl 202523 Lùna 2025Dearbhaichte
$117,021–$156,530
Ìre II
Greenwood Village, CO6 Màrt 202511 Lùna 2025Dearbhaichte
$112,798–$156,600
Ìre II
Greenwood Village, CO25 Faoi 202416 Cèit 2024Dearbhaichte
$116,563–$152,300
Ìre IV
Greenwood Village, CO28 Dùbh 202210 Faoi 2023Dearbhaichte

Obraichean eile aig Charter Communications, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).