Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Chewy, Inc. › Data Warehouse Engineer III

Data Warehouse Engineer III aig Chewy, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Data Warehouse Engineer III aig Chewy, Inc.. Tuarastal bunasach meadhanach $171,478; leth meadhanach $158,825–$174,639.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$171,478
Leath mheadhanach nan tuarastalan$158,825–$174,639
Ceudail 10mh–90mh$152,650–$179,250

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$152,650
FY20241$169,400
FY20253$175,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$173,555
Ìre III
Boston, MA23 Gibl 202529 Sult 2025Dearbhaichte
$175,000
Ìre III
Plantation, FL8 Faoi 202528 Ògmh 2025Dearbhaichte
$183,500
Ìre IV
Boston, MA24 Samh 202417 Màrt 2025Dearbhaichte
$169,400
Ìre IV
Boston, MA6 Samh 202321 Màrt 2024Dearbhaichte
$155,300Boston, MA30 Lùna 20236 Sult 2023Dearbhaichte
$150,000
Ìre III
Plantation, FL23 Dùbh 20229 Faoi 2023Dearbhaichte

Obraichean eile aig Chewy, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).