Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › City National Bank › Lead Full Stack Engineer

Lead Full Stack Engineer aig City National Bank: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Lead Full Stack Engineer aig City National Bank. Tuarastal bunasach meadhanach $167,267; leth meadhanach $111,408–$171,700.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$167,267
Leath mheadhanach nan tuarastalan$111,408–$171,700
Ceudail 10mh–90mh$111,408–$176,134

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$111,408
FY20241$111,408
FY20254$171,700

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$167,267–$189,738Monmouth Junction, NJ13 Cèit 202520 Cèit 2025Dearbhaichte
$167,267–$189,738Jersey City, NJ13 Cèit 202520 Cèit 2025Dearbhaichte
$176,134–$189,738
Ìre IV
Azusa, CA17 Dùbh 202415 Gearr 2025Dearbhaichte
$176,134–$189,738
Ìre IV
Los Angeles, CA17 Dùbh 202415 Gearr 2025Dearbhaichte
$111,408–$189,738
Ìre II
Frisco, TX15 Cèit 202423 Cèit 2024Dearbhaichte
$111,408–$189,738
Ìre II
New York, NY9 Ògmh 202320 Ògmh 2023Dearbhaichte
$111,408–$189,738
Ìre II
Bridgewater, NJ9 Ògmh 202320 Ògmh 2023Dearbhaichte

Lead Full Stack Engineer aig gach neach-fastaidh →

Obraichean eile aig City National Bank

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).