Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Climax Molybdenum Company

Climax Molybdenum Company: Tuarastalan H-1B agus taic bhìosa

Chuir Climax Molybdenum Company 18 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 18. Tuarastal meadhanach a chaidh a thabhann: $105,250.

Iarrtasan (LCAs)18
Dearbhaichte18
Seòladh an neach-fhastaidhPhoenix, AZ
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$105,250
Leath mheadhanach nan tuarastalan$96,025–$108,461
Ceudail 10mh–90mh$85,150–$122,430

A bheil Climax Molybdenum Company a’ toirt taic do bhìosaichean H-1B?

Chuir Climax Molybdenum Company 18 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 3 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Iarrtasan cairt uaine (PERM) aig Climax Molybdenum Company: 5 →

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Senior Engineer2$121,743
Mine Engineer II2$105,250
Mine Engineer I2$99,500
Geomechanical Engineer II2$106,372
Mechanical Engineer I2$84,100
Electrical Engineer II1$94,000
Reliability Engineer II1$122,100
Engineer I - Project Development1$85,600
Senior Metallurgist1$125,000
Metallurgist II1$102,100
Process Automation Engineer II1$105,000
Mechanical Engineer II1$105,500
Metallurgist I1$108,700

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20234$111,893
FY20242$99,000
FY20259$105,000
FY20263$107,000

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Mine Engineer I$106,000
Ìre I
Climax, CO3 Ògmh 20261 Dàmh 2026Dearbhaichte
Metallurgist I$108,700
Ìre I
Parshall, CO3 Ògmh 20261 Dàmh 2026Dearbhaichte
Mine Engineer II$107,000
Ìre II
Climax, CO26 Sult 202520 Dàmh 2025Dearbhaichte
Senior Engineer$123,200
Ìre III
Empire, CO14 Iuch 202524 Lùna 2025Dearbhaichte
Mechanical Engineer II$105,500
Ìre II
Fort Madison, IA4 Ògmh 20251 Dàmh 2025Dearbhaichte
Process Automation Engineer II$105,000
Ìre II
Parshall, CO4 Ògmh 20251 Dàmh 2025Dearbhaichte
Mechanical Engineer I$84,100
Ìre I
Empire, CO20 Gibl 202519 Cèit 2025Dearbhaichte
Mechanical Engineer I$84,100
Ìre I
Empire, CO1 Gibl 20252 Ògmh 2025Dearbhaichte
Engineer I - Project Development$85,600
Ìre I
Fort Madison, IA24 Dàmh 20244 Samh 2024Dearbhaichte
Senior Metallurgist$125,000
E-3 · Ìre III
Climax, CO17 Dàmh 202411 Samh 2024Dearbhaichte
Geomechanical Engineer II$107,744
Ìre II
Climax, CO17 Dàmh 202428 Dàmh 2024Dearbhaichte
Metallurgist II$102,100
Ìre II
Fort Madison, IA1 Dàmh 202428 Gearr 2025Dearbhaichte
Geomechanical Engineer II$105,000
Ìre II
Empire, CO22 Gibl 20241 Dàmh 2024Dearbhaichte
Mine Engineer I$93,000
Ìre I
Climax, CO22 Gibl 20241 Dàmh 2024Dearbhaichte
Reliability Engineer II$122,100
Ìre II
Climax, CO3 Lùna 20231 Dàmh 2023Dearbhaichte
Electrical Engineer II$94,000
Ìre II
Climax, CO26 Cèit 20231 Dàmh 2023Dearbhaichte
Mine Engineer II$103,500
Ìre II
Empire, CO14 Màrt 202310 Lùna 2023Dearbhaichte
Senior Engineer$120,286
Ìre III
Lakewood, CO6 Dùbh 202219 Dùbh 2022Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).