Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cohesity, Inc. › Sr. Site Reliability Engineer

Sr. Site Reliability Engineer aig Cohesity, Inc.: Tuarastalan H-1B

10 iarrtasan cumhaichean-obrach airson an dreuchd Sr. Site Reliability Engineer aig Cohesity, Inc.. Tuarastal bunasach meadhanach $125,650; leth meadhanach $121,115–$140,116.

Iarrtasan (LCAs)10
Tuarastal meadhanach a chaidh a thabhann$125,650
Leath mheadhanach nan tuarastalan$121,115–$140,116
Ceudail 10mh–90mh$101,421–$141,406

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20234$110,929
FY20243$139,443
FY20263$128,080

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$128,080–$192,000Santa Clara, CA29 Cèit 20261 Dàmh 2026Dearbhaichte
$140,795–$163,200
Ìre IV
Concord, NC8 Gibl 202620 Gibl 2026Dearbhaichte
$123,219–$163,200
Ìre IV
Aubrey, TX6 Faoi 202631 Cèit 2026Dearbhaichte
$123,149–$161,400Aubrey, TX15 Lùna 202427 Faoi 2025Dearbhaichte
$139,443–$189,600
Ìre III
San Jose, CA5 Lùna 202415 Faoi 2025Dearbhaichte
$146,910–$161,400
Ìre IV
Herndon, VA7 Màrt 20241 Lùna 2024Dearbhaichte
$140,340–$159,450San Jose, CA25 Iuch 20231 Faoi 2024Dearbhaichte
$120,437–$130,437San Jose, CA13 Gibl 20231 Dàmh 2023Dearbhaichte
$101,421–$111,421
Ìre II
Durham, NC6 Gibl 20231 Dàmh 2023Dearbhaichte
$101,421–$123,743
Ìre II
Durham, NC3 Gibl 20231 Dàmh 2023Dearbhaichte

Sr. Site Reliability Engineer aig gach neach-fastaidh →

Obraichean eile aig Cohesity, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).