Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › CommVault Systems,Inc. › Principal Engineer III

Principal Engineer III aig CommVault Systems,Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Principal Engineer III aig CommVault Systems,Inc.. Tuarastal bunasach meadhanach $167,100; leth meadhanach $155,800–$194,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$167,100
Leath mheadhanach nan tuarastalan$155,800–$194,000
Ceudail 10mh–90mh$155,800–$202,100

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20253$155,800
FY20262$200,750

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$194,000–$200,000
Ìre III
Tinton Falls, NJ31 Màrt 20261 Sult 2026Dearbhaichte
$207,500–$220,000
Ìre II
Tinton Falls, NJ2 Gearr 20261 Lùna 2026Dearbhaichte
$167,100–$200,000
Ìre II
Cumming, GA12 Màrt 202530 Lùna 2025Dearbhaichte
$155,800–$200,000
Ìre II
Tinton Falls, NJ9 Dùbh 202416 Cèit 2025Dearbhaichte
$155,800–$210,000
Ìre II
Tinton Falls, NJ9 Dùbh 202416 Cèit 2025Dearbhaichte

Obraichean eile aig CommVault Systems,Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).