Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Comprehensive Resources, Inc. › Scrum Master

Scrum Master aig Comprehensive Resources, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Scrum Master aig Comprehensive Resources, Inc.. Tuarastal bunasach meadhanach $78,478; leth meadhanach $78,478–$86,000.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$78,478
Leath mheadhanach nan tuarastalan$78,478–$86,000
Ceudail 10mh–90mh$76,391–$86,600

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$75,000
FY20242$78,478
FY20262$86,500

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$86,000
Ìre II
Richmond, VA9 Gearr 202623 Gearr 2026Dearbhaichte
$87,000
Ìre II
Charlotte, NC22 Dùbh 20255 Faoi 2026Dearbhaichte
$78,478
Ìre II
Old Bridge, NJ14 Ògmh 20241 Dàmh 2024Dearbhaichte
$78,478
Ìre II
Old Bridge, NJ8 Cèit 20241 Dàmh 2024Dearbhaichte
$75,000
Ìre II
Old Bridge, NJ31 Cèit 20231 Dàmh 2023Dearbhaichte

Scrum Master aig gach neach-fastaidh →

Obraichean eile aig Comprehensive Resources, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).