Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Conflux Systems Inc › Project Manager

Project Manager aig Conflux Systems Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Project Manager aig Conflux Systems Inc. Tuarastal bunasach meadhanach $60,000; leth meadhanach $60,000–$67,500.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$60,000
Leath mheadhanach nan tuarastalan$60,000–$67,500
Ceudail 10mh–90mh$60,000–$72,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$67,500
FY20241$60,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$60,000–$90,000
Ìre II
Fort Wayne, IN24 Gibl 20242 Cèit 2024Dearbhaichte
$60,000–$85,000
Ìre II
Fort Wayne, IN2 Ògmh 202312 Ògmh 2023Dearbhaichte
$60,000–$85,000
Ìre II
Fort Wayne, IN2 Ògmh 202312 Ògmh 2023Air a tharraing air ais
$60,000–$85,000
Ìre II
Fort Wayne, IN2 Ògmh 202312 Ògmh 2023Air a tharraing air ais
$75,000
Ìre II
Alpharetta, GA6 Gibl 202314 Gibl 2023Dearbhaichte

Project Manager aig gach neach-fastaidh →

Obraichean eile aig Conflux Systems Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).