Dachaigh › Luchd-obrach › Consigli Construction Co., Inc.
Consigli Construction Co., Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Consigli Construction Co., Inc. 11 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 11. Tuarastal meadhanach a chaidh a thabhann: $136,000.
A bheil Consigli Construction Co., Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Consigli Construction Co., Inc. 11 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 15 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Cost Planner | 2 | $151,705 |
| VDC Manager – Virtual Design Construction | 2 | $135,964 |
| Chief Cost Planner | 1 | $252,000 |
| Senior VDC Engineer | 1 | $120,000 |
| Assistant Project Manager | 1 | $103,501 |
| Senior M/E/P Manager | 1 | $210,000 |
| Estimating Engineer | 1 | $81,000 |
| Estimator | 1 | $100,006 |
| Senior Project Design Manager | 1 | $256,506 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 1 | $252,000 |
| FY2025 | 4 | $132,457 |
| FY2026 | 6 | $135,964 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Cost Estimators5
- Architectural and Engineering Managers3
- Civil Engineers1
- Project Management Specialists1
- Construction Managers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Cost Planner | $158,496 Ìre II | New York, NY | 15 Ògmh 2026 | 1 Dùbh 2026 | Dearbhaichte |
| Senior Project Design Manager | $256,506 E-3 · Ìre II | New York, NY | 15 Cèit 2026 | 1 Ògmh 2026 | Dearbhaichte |
| VDC Manager – Virtual Design Construction | $136,000 Ìre II | New York, NY | 8 Cèit 2026 | 15 Cèit 2026 | Dearbhaichte |
| Estimating Engineer | $81,000 Ìre II | New York, NY | 4 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Estimator | $100,006 Ìre II | Milford, MA | 4 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| VDC Manager – Virtual Design Construction | $135,928 Ìre I | New York, NY | 19 Màrt 2026 | 13 Gibl 2026 | Dearbhaichte |
| Senior M/E/P Manager | $210,000 Ìre IV | Washington, DC | 30 Ògmh 2025 | 14 Iuch 2025 | Dearbhaichte |
| Cost Planner | $144,914 Ìre IV | New York, NY | 3 Màrt 2025 | 1 Sult 2025 | Dearbhaichte |
| Assistant Project Manager | $103,501 Ìre II | East Brunswick, NJ | 26 Dùbh 2024 | 1 Màrt 2025 | Dearbhaichte |
| Senior VDC Engineer | $120,000 Ìre IV | Milford, MA | 8 Samh 2024 | 25 Samh 2024 | Dearbhaichte |
| Chief Cost Planner | $252,000 Ìre IV | New York, NY | 8 Lùna 2024 | 1 Sult 2024 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).