Dachaigh › Luchd-obrach › Core Tech Construction Corporation › Electrical Engineer
Electrical Engineer aig Core Tech Construction Corporation: Tuarastalan H-1B
54 iarrtasan cumhaichean-obrach airson an dreuchd Electrical Engineer aig Core Tech Construction Corporation. Tuarastal bunasach meadhanach $60,000; leth meadhanach $56,400–$65,500.
Iarrtasan (LCAs)54
Tuarastal meadhanach a chaidh a thabhann$60,000
Leath mheadhanach nan tuarastalan$56,400–$65,500
Ceudail 10mh–90mh$55,020–$79,500
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 6 | $56,400 |
| FY2024 | 7 | $55,200 |
| FY2025 | 17 | $60,000 |
| FY2026 | 22 | $64,000 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $61,000 Ìre II | Tamuning, GU | 23 Ògmh 2026 | 15 Dùbh 2026 | Dearbhaichte |
| $80,000 Ìre III | Tamuning, GU | 16 Ògmh 2026 | 1 Sult 2026 | Dearbhaichte |
| $55,000 Ìre I | Tamuning, GU | 9 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $75,000 Ìre III | Tamuning, GU | 9 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $56,400 Ìre I | Tamuning, GU | 8 Ògmh 2026 | 15 Iuch 2026 | Dearbhaichte |
| $59,000 Ìre I | Tamuning, GU | 2 Ògmh 2026 | 1 Dùbh 2026 | Dearbhaichte |
| $59,000 Ìre I | Tamuning, GU | 2 Ògmh 2026 | 1 Dùbh 2026 | Dearbhaichte |
| $52,000 Ìre I | Tamuning, GU | 18 Cèit 2026 | 1 Ògmh 2026 | Dearbhaichte |
| $61,000 Ìre II | Tamuning, GU | 5 Cèit 2026 | 1 Samh 2026 | Dearbhaichte |
| $62,500 Ìre II | Tamuning, GU | 16 Màrt 2026 | 15 Sult 2026 | Dearbhaichte |
| $62,500 Ìre II | Tamuning, GU | 16 Màrt 2026 | 15 Sult 2026 | Dearbhaichte |
| $65,500 Ìre II | Tamuning, GU | 12 Màrt 2026 | 13 Màrt 2026 | Dearbhaichte |
| $65,500 Ìre II | Tamuning, GU | 12 Màrt 2026 | 13 Màrt 2026 | Dearbhaichte |
| $65,500 Ìre II | Tamuning, GU | 11 Màrt 2026 | 13 Màrt 2026 | Dearbhaichte |
| $65,500 Ìre II | Tamuning, GU | 11 Màrt 2026 | 15 Màrt 2026 | Dearbhaichte |
| $66,500 Ìre II | Tamuning, GU | 3 Màrt 2026 | 15 Gibl 2026 | Dearbhaichte |
| $66,500 Ìre II | Tamuning, GU | 3 Màrt 2026 | 15 Gibl 2026 | Dearbhaichte |
| $75,000 Ìre III | Tamuning, GU | 13 Samh 2025 | 1 Gearr 2026 | Dearbhaichte |
| $60,000 Ìre I | Tamuning, GU | 3 Samh 2025 | 15 Gibl 2026 | Dearbhaichte |
| $62,400 Ìre II | Tamuning, GU | 3 Samh 2025 | 1 Dùbh 2025 | Dearbhaichte |
| $83,000 Ìre IV | Tamuning, GU | 24 Sult 2025 | 15 Màrt 2026 | Dearbhaichte |
| $49,899 Ìre I | Tamuning, GU | 17 Sult 2025 | 15 Dàmh 2025 | Dearbhaichte |
| $55,000 Ìre I | Tamuning, GU | 4 Sult 2025 | 1 Samh 2025 | Dearbhaichte |
| $68,910 Ìre II | Tamuning, GU | 28 Iuch 2025 | 15 Sult 2025 | Dearbhaichte |
| $65,000 Ìre II | Tamuning, GU | 16 Iuch 2025 | 15 Sult 2025 | Dearbhaichte |
| $68,910 Ìre II | Tamuning, GU | 14 Iuch 2025 | 15 Sult 2025 | Dearbhaichte |
| $90,000 Ìre IV | Tamuning, GU | 23 Màrt 2025 | 1 Sult 2025 | Dearbhaichte |
| $60,000 Ìre II | Tamuning, GU | 18 Màrt 2025 | 1 Sult 2025 | Dearbhaichte |
| $60,000 Ìre II | Tamuning, GU | 18 Màrt 2025 | 1 Sult 2025 | Dearbhaichte |
| — Ìre II | Tamuning, GU | 18 Màrt 2025 | 1 Sult 2025 | Dearbhaichte |
| $80,000 Ìre IV | Tamuning, GU | 19 Gearr 2025 | 15 Gibl 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| $60,000 Ìre II | Tamuning, GU | 8 Dùbh 2024 | 1 Faoi 2025 | Dearbhaichte |
| $60,000 Ìre II | Tamuning, GU | 2 Dùbh 2024 | 1 Faoi 2025 | Dearbhaichte |
| $60,000 Ìre II | Tamuning, GU | 19 Samh 2024 | 1 Faoi 2025 | Dearbhaichte |
| $60,000 Ìre II | Tamuning, GU | 29 Dàmh 2024 | 1 Gibl 2025 | Dearbhaichte |
| $57,000 Ìre II | Tamuning, GU | 29 Dàmh 2024 | 1 Gibl 2025 | Dearbhaichte |
| $57,000 Ìre II | Tamuning, GU | 29 Dàmh 2024 | 1 Gibl 2025 | Dearbhaichte |
| $57,000 Ìre II | Tamuning, GU | 29 Dàmh 2024 | 1 Gibl 2025 | Dearbhaichte |
| $60,000 Ìre II | Tamuning, GU | 28 Dàmh 2024 | 1 Faoi 2025 | Dearbhaichte |
| $55,200 Ìre I | Tamuning, GU | 17 Sult 2024 | 15 Dùbh 2024 | Dearbhaichte |
| $80,000 Ìre II | Tamuning Guam, GU | 7 Gearr 2024 | 1 Màrt 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| — Ìre III | Tamuning, GU | 24 Faoi 2024 | 1 Màrt 2024 | Diùltadh |
| $55,200 Ìre I | Tamuning, GU | 2 Samh 2023 | 15 Dùbh 2023 | Dearbhaichte |
| $56,400 Ìre I | Tamuning, GU | 18 Dàmh 2023 | 1 Dùbh 2023 | Dearbhaichte |
| $53,685 Ìre I | Tamuning, GU | 16 Dàmh 2023 | 1 Dùbh 2023 | Dearbhaichte |
| $56,400 Ìre I | Tamuning, GU | 16 Dàmh 2023 | 1 Dùbh 2023 | Dearbhaichte |
| $55,200 Ìre I | Tamuning, GU | 16 Dàmh 2023 | 1 Dùbh 2023 | Dearbhaichte |
| $55,200 Ìre I | Tamuning, GU | 27 Sult 2023 | 1 Samh 2023 | Dearbhaichte |
| $55,200 Ìre I | Tamuning, GU | 30 Lùna 2023 | 1 Samh 2023 | Dearbhaichte |
| $56,400 Ìre I | Tamuning, GU | 1 Lùna 2023 | 15 Sult 2023 | Dearbhaichte |
| $56,400 Ìre I | Tamuning, GU | 1 Lùna 2023 | 15 Sult 2023 | Dearbhaichte |
| $56,400 Ìre I | Tamuning, GU | 1 Lùna 2023 | 15 Sult 2023 | Dearbhaichte |
| $50,606 Ìre I | Tamuning, GU | 27 Màrt 2023 | 15 Gibl 2023 | Dearbhaichte |
| $80,000 Ìre III | Tamuning, GU | 5 Màrt 2023 | 15 Màrt 2023 | Dearbhaichte |
Electrical Engineer aig gach neach-fastaidh →
Obraichean eile aig Core Tech Construction Corporation
- Civil Engineer$60,000
- Mechanical Engineer$58,750
- Accountant$39,600
- Architect$77,000
- Safety Engineer$68,910
- Construction Manager$85,000
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).