Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cove Point LNG, LP

Cove Point LNG, LP: Tuarastalan H-1B agus taic bhìosa

Chuir Cove Point LNG, LP 10 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 10. Tuarastal meadhanach a chaidh a thabhann: $136,022.

Iarrtasan (LCAs)10
Dearbhaichte10
Seòladh an neach-fhastaidhLusby, MD
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$136,022
Leath mheadhanach nan tuarastalan$122,391–$157,863
Ceudail 10mh–90mh$120,000–$164,744

A bheil Cove Point LNG, LP a’ toirt taic do bhìosaichean H-1B?

Chuir Cove Point LNG, LP 10 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 18 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Sr. LNG Technician - Operations3$120,000
Supervisor, LNG Operations1$155,530
Lead LNG Technician (Operations)1$139,506
Senior LNG Technician1$129,563
Superintendent LNG Operations1$179,169
Principal Engineer1$158,641
LNG Principal Engineer1$163,141
Sr. Plant Controls Technician1$120,000

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$158,641
FY20253$139,506
FY20264$120,000

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Sr. Plant Controls Technician$120,000Lusby, MD18 Cèit 20261 Dàmh 2026Dearbhaichte
Sr. LNG Technician - Operations$120,000
Ìre II
Lusby, MD18 Cèit 20261 Dàmh 2026Dearbhaichte
Sr. LNG Technician - Operations$120,000
Ìre II
Lusby, MD18 Cèit 20261 Dàmh 2026Dearbhaichte
LNG Principal Engineer$163,141
Ìre IV
Lusby, MD3 Samh 202524 Màrt 2026Dearbhaichte
Sr. LNG Technician - Operations$132,538
Ìre II
Lusby, MD30 Cèit 202518 Sult 2025Dearbhaichte
Principal Engineer$158,641
Ìre IV
Lusby, MD22 Iuch 20248 Samh 2024Dearbhaichte
Lead LNG Technician (Operations)$139,506
Ìre IV
Lusby, MD24 Gibl 202429 Gibl 2024Dearbhaichte, an uair sin air a tharraing air ais
Senior LNG Technician$129,563
Ìre II
Lusby, MD18 Gibl 202420 Sult 2024Dearbhaichte
Superintendent LNG Operations$179,169
Ìre IV
Lusby, MD16 Gibl 20241 Dàmh 2024Dearbhaichte
Supervisor, LNG Operations$155,530
Ìre II
Lusby, MD16 Gearr 20241 Iuch 2024Dearbhaichte, an uair sin air a tharraing air ais

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).