Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Critical Path Institute

Critical Path Institute: Tuarastalan H-1B agus taic bhìosa

Chuir Critical Path Institute 11 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 10. Tuarastal meadhanach a chaidh a thabhann: $87,641.

Iarrtasan (LCAs)11
Dearbhaichte10
Seòladh an neach-fhastaidhTucson, AZ
Neach-fhastaidh an urra ri H-1BChan eil
Tuarastal meadhanach a chaidh a thabhann$87,641
Leath mheadhanach nan tuarastalan$79,278–$107,117
Ceudail 10mh–90mh$75,900–$120,390

A bheil Critical Path Institute a’ toirt taic do bhìosaichean H-1B?

Chuir Critical Path Institute 11 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 28 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.

Tuarastalan a rèir tiotal obrach

Tiotal dreuchdLCAsTuarastal meadhanach
Quantitative Medicine Developer3$75,900
Quantitative Medicine Scientist3$121,951
Data Analyst2$88,623
Quantitative Medicine Developer II1$88,858
Senior Data Analyst1$112,549
Data and Analytics Platform Support Administrator1$83,000

Iarrtasan a rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$88,858
FY20244$75,900
FY20252$100,970
FY20262$97,774

Ìrean tuarastail làithreach

Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.

Far a bheil na h-obraichean

Dreuchdan

Iarrtasan as ùire

Tiotal dreuchdTuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
Data and Analytics Platform Support Administrator$83,000
Ìre II
Tucson, AZ28 Gibl 202615 Cèit 2026Dearbhaichte
Senior Data Analyst$112,549–$120,480
Ìre II
Foster City, CA4 Gearr 202625 Cèit 2026Dearbhaichte
Quantitative Medicine Developer$78,038–$93,720
Ìre I
Los Angeles, CA24 Iuch 20251 Lùna 2025Dearbhaichte
Quantitative Medicine Scientist$123,902
Ìre II
Montclair, NJ21 Gearr 202517 Màrt 2025Dearbhaichte, an uair sin air a tharraing air ais
Quantitative Medicine Scientist$120,000–$138,600
Ìre IV
Corning, NY7 Cèit 202420 Cèit 2024Dearbhaichte
Quantitative Medicine Scientist$120,000–$138,600
Ìre IV
Corning, NY6 Cèit 202420 Cèit 2024Air a tharraing air ais
Quantitative Medicine Developer$75,900–$91,080
Ìre I
Davis, CA10 Faoi 20241 Cèit 2024Dearbhaichte
Quantitative Medicine Developer$75,900–$91,080
Ìre I
Davis, CA13 Dùbh 20231 Cèit 2024Dearbhaichte
Quantitative Medicine Developer II$88,858–$104,760
Ìre II
Azusa, CA28 Gibl 20231 Ògmh 2023Dearbhaichte
Data Analyst$86,424–$91,080
Ìre II
Foster City, CA21 Gearr 202325 Cèit 2023Dearbhaichte
Data Analyst$90,822
Ìre II
Foster City, CA28 Sult 20227 Dàmh 2022Dearbhaichte

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).