Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cummins Emission Solutions Inc. › Product Engineer

Product Engineer aig Cummins Emission Solutions Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Product Engineer aig Cummins Emission Solutions Inc.. Tuarastal bunasach meadhanach $73,649; leth meadhanach $69,693–$78,953.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$73,649
Leath mheadhanach nan tuarastalan$69,693–$78,953
Ceudail 10mh–90mh$67,236–$85,301

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$73,885
FY20242$70,933
FY20253$80,642

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$80,642–$114,000
Ìre II
Mineral Point, WI5 Cèit 20251 Dàmh 2025Dearbhaichte
$89,960–$114,000
Ìre I
Columbus, IN25 Dàmh 20244 Samh 2024Dearbhaichte
$68,453–$97,200
Ìre I
Columbus, IN14 Ògmh 20241 Dàmh 2024Dearbhaichte
$66,019–$97,200
Ìre I
Stoughton, WI1 Ògmh 20241 Dàmh 2024Dearbhaichte, an uair sin air a tharraing air ais
$73,413–$97,200Columbus, IN10 Cèit 20241 Dàmh 2024Dearbhaichte
$73,885–$93,600Stoughton, WI4 Dàmh 20227 Samh 2022Dearbhaichte
$71,304–$93,600Stoughton, WI3 Dàmh 20227 Samh 2022Diùltadh

Product Engineer aig gach neach-fastaidh →

Obraichean eile aig Cummins Emission Solutions Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).