Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cummins Inc. › Electronic Systems Product Advisor

Electronic Systems Product Advisor aig Cummins Inc.: Tuarastalan H-1B

20 iarrtasan cumhaichean-obrach airson an dreuchd Electronic Systems Product Advisor aig Cummins Inc.. Tuarastal bunasach meadhanach $116,000; leth meadhanach $102,710–$126,880.

Iarrtasan (LCAs)20
Tuarastal meadhanach a chaidh a thabhann$116,000
Leath mheadhanach nan tuarastalan$102,710–$126,880
Ceudail 10mh–90mh$101,520–$132,492

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20238$101,520
FY20245$120,000
FY20253$126,235
FY20264$137,717

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$144,248–$168,000
Ìre II
Columbus, IN9 Ògmh 202625 Sult 2026Dearbhaichte
$146,536–$186,000
Ìre IV
Columbus, IN20 Cèit 20261 Dàmh 2026Dearbhaichte
$112,000–$168,000
Ìre III
Columbus, IN5 Faoi 20261 Iuch 2026Dearbhaichte
$131,186–$168,000
Ìre IV
Shoreview, MN16 Dùbh 202512 Ògmh 2026Dearbhaichte
$124,000–$186,000
Ìre III
Columbus, IN1 Cèit 202512 Cèit 2025Dearbhaichte
$130,354–$182,400
Ìre III
Columbus, IN28 Màrt 202525 Sult 2025Dearbhaichte
$126,235–$164,400
Ìre III
West Sacramento, CA22 Dùbh 20245 Ògmh 2025Dearbhaichte
$121,600–$182,400
Ìre IV
Columbus, IN26 Lùna 202420 Gearr 2025Dearbhaichte
$109,600–$164,400
Ìre III
Columbus, IN26 Lùna 202421 Gearr 2025Dearbhaichte
$128,814–$164,400
Ìre IV
Columbus, IN23 Lùna 20241 Dàmh 2024Dearbhaichte
$108,000–$162,000
Ìre II
Columbus, IN20 Samh 202317 Cèit 2024Dearbhaichte
$120,000–$180,000
Ìre III
Columbus, IN24 Dàmh 202316 Gibl 2024Dearbhaichte
$108,000–$162,000
Ìre II
Columbus, IN7 Sult 202325 Sult 2023Dearbhaichte
$101,520–$152,280
Ìre II
Seymour, IN20 Iuch 202318 Faoi 2024Dearbhaichte
$103,106–$152,280
Ìre III
Shoreview, MN8 Cèit 20233 Samh 2023Dearbhaichte
$101,520–$152,280
Ìre II
Columbus, IN17 Gibl 202317 Dàmh 2023Dearbhaichte
$101,520–$152,280
Ìre II
Columbus, IN20 Màrt 202331 Lùna 2023Dearbhaichte
$101,520–$152,280
Ìre III
Columbus, IN30 Faoi 202331 Iuch 2023Dearbhaichte
$124,197–$169,800
Ìre II
Columbus, IN13 Dàmh 202231 Dàmh 2022Dearbhaichte
$101,520–$152,280
Ìre III
Columbus, IN13 Dàmh 202214 Gibl 2023Dearbhaichte

Obraichean eile aig Cummins Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).