Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cummins Inc. › ES Engineer

ES Engineer aig Cummins Inc.: Tuarastalan H-1B

12 iarrtasan cumhaichean-obrach airson an dreuchd ES Engineer aig Cummins Inc.. Tuarastal bunasach meadhanach $92,354; leth meadhanach $88,683–$96,304.

Iarrtasan (LCAs)12
Tuarastal meadhanach a chaidh a thabhann$92,354
Leath mheadhanach nan tuarastalan$88,683–$96,304
Ceudail 10mh–90mh$76,300–$96,304

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$76,107
FY20243$96,304
FY20254$92,354
FY20262$92,759

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$93,288–$115,200
Ìre II
Seymour, IN4 Ògmh 20261 Dàmh 2026Dearbhaichte
$92,230–$115,200Columbus, IN29 Cèit 20251 Dàmh 2025Dearbhaichte
$92,230–$115,200Columbus, IN20 Cèit 202515 Samh 2025Dearbhaichte, an uair sin air a tharraing air ais
$103,438–$114,000
Ìre II
Columbus, IN5 Cèit 20251 Dàmh 2025Dearbhaichte
$92,477–$114,000Columbus, IN10 Gearr 202517 Gearr 2025Dearbhaichte
$92,230–$114,000Columbus, IN2 Gearr 202518 Iuch 2025Dearbhaichte
$96,304–$114,000
Ìre II
Columbus, IN10 Cèit 20241 Dàmh 2024Dearbhaichte
$96,304–$114,000
Ìre II
Columbus, IN22 Gibl 20241 Dàmh 2024Dearbhaichte
$96,304–$114,000
Ìre II
Columbus, IN20 Dùbh 202319 Ògmh 2024Dearbhaichte
$78,042–$108,000
Ìre II
Shoreview, MN4 Gibl 202329 Sult 2023Dearbhaichte
$76,107–$108,000
Ìre II
Columbus, IN29 Màrt 202327 Sult 2023Dearbhaichte
$76,107–$108,000
Ìre II
Columbus, IN1 Gearr 202310 Gearr 2023Dearbhaichte

Obraichean eile aig Cummins Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).