Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cummins Inc. › Master Production Scheduler

Master Production Scheduler aig Cummins Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Master Production Scheduler aig Cummins Inc.. Tuarastal bunasach meadhanach $91,853; leth meadhanach $81,999–$96,574.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$91,853
Leath mheadhanach nan tuarastalan$81,999–$96,574
Ceudail 10mh–90mh$78,880–$104,012

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20253$91,853
FY20262$86,687

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$96,574–$115,200
Ìre III
Fletcher, NC1 Gibl 202625 Sult 2026Dearbhaichte
$76,800–$115,200
Ìre II
Fridley, MN21 Samh 20258 Dùbh 2025Dearbhaichte
$108,971–$133,200
Ìre III
Fridley, MN28 Lùna 202521 Gearr 2026Dearbhaichte
$91,853–$112,200
Ìre II
Fort Worth, TX2 Gibl 20259 Gibl 2025Dearbhaichte
$81,999–$112,200New Orleans, LA10 Gearr 202519 Gearr 2025Dearbhaichte

Obraichean eile aig Cummins Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).