Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cummins Inc. › Project Manager - Engineering

Project Manager - Engineering aig Cummins Inc.: Tuarastalan H-1B

18 iarrtasan cumhaichean-obrach airson an dreuchd Project Manager - Engineering aig Cummins Inc.. Tuarastal bunasach meadhanach $96,304; leth meadhanach $91,613–$102,094.

Iarrtasan (LCAs)18
Tuarastal meadhanach a chaidh a thabhann$96,304
Leath mheadhanach nan tuarastalan$91,613–$102,094
Ceudail 10mh–90mh$87,824–$115,057

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20235$89,378
FY20247$96,000
FY20252$110,890
FY20264$108,282

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$121,181–$146,400
Ìre III
Columbus, IN1 Cèit 202628 Dàmh 2026Dearbhaichte
$99,050–$146,400
Ìre II
Columbus, IN24 Gibl 202621 Dàmh 2026Dearbhaichte
$114,251–$146,400San Leandro, CA27 Màrt 202616 Ògmh 2026Dearbhaichte
$102,312–$146,400San Leandro, CA23 Gearr 202616 Ògmh 2026Dearbhaichte
$104,843–$146,400Columbus, IN8 Sult 20254 Màrt 2026Dearbhaichte
$116,938–$127,200
Ìre III
Columbus, IN11 Gibl 202527 Sult 2025Dearbhaichte
$84,800–$127,200
Ìre II
Columbus, IN30 Gibl 202422 Dàmh 2024Dearbhaichte
$96,000–$144,000
Ìre II
West Sacramento, CA19 Gibl 202411 Iuch 2024Dearbhaichte
$92,019–$126,000
Ìre II
Columbus, IN26 Gearr 202424 Lùna 2024Dearbhaichte
$96,304–$144,000
Ìre II
Columbus, IN1 Gearr 202426 Iuch 2024Dearbhaichte
$94,557–$126,000Columbus, IN29 Faoi 202430 Iuch 2024Dearbhaichte
$96,304–$126,000
Ìre II
Columbus, IN4 Dùbh 202331 Cèit 2024Dearbhaichte, an uair sin air a tharraing air ais
$101,044–$126,000Columbus, IN1 Samh 202327 Gibl 2024Dearbhaichte, an uair sin air a tharraing air ais
$101,442–$120,000
Ìre III
Fridley, MN17 Gibl 202326 Ògmh 2023Dearbhaichte
$80,000–$120,000
Ìre II
Columbus, IN15 Màrt 202312 Sult 2023Dearbhaichte
$89,120–$133,680
Ìre II
Columbus, IN7 Màrt 202324 Màrt 2023Dearbhaichte
$91,478–$120,000
Ìre III
Whitakers, NC27 Gearr 20238 Màrt 2023Dearbhaichte
$89,378–$120,000
Ìre II
Mineral Point, WI27 Dàmh 20226 Dùbh 2022Dearbhaichte

Obraichean eile aig Cummins Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).