Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cummins Inc. › Project Manager (Information Technology)

Project Manager (Information Technology) aig Cummins Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Project Manager (Information Technology) aig Cummins Inc.. Tuarastal bunasach meadhanach $95,805; leth meadhanach $82,898–$106,132.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$95,805
Leath mheadhanach nan tuarastalan$82,898–$106,132
Ceudail 10mh–90mh$79,814–$106,954

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20233$106,954
FY20242$80,018
FY20252$93,714

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$82,118–$112,200
Ìre II
Minneapolis, MN31 Faoi 202515 Ògmh 2025Dearbhaichte
$105,310–$129,600
Ìre III
Maplewood, MN7 Faoi 202512 Ògmh 2025Dearbhaichte
$76,357–$110,400
Ìre II
Shoreview, MN3 Samh 20233 Cèit 2024Dearbhaichte
$106,954–$120,000
Ìre IV
Columbus, IN31 Màrt 20233 Lùna 2023Dearbhaichte
$106,954–$120,000
Ìre IV
Columbus, IN22 Gearr 20233 Lùna 2023Dearbhaichte, an uair sin air a tharraing air ais
$95,805–$120,000
Ìre III
Shoreview, MN15 Gearr 202314 Màrt 2023Dearbhaichte
$83,678–$104,160
Ìre III
Columbus, IN2 Gearr 20223 Lùna 2022Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig Cummins Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).