Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cummins Inc. › Structural and Dynamic Systems Engineer - Experimental

Structural and Dynamic Systems Engineer - Experimental aig Cummins Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Structural and Dynamic Systems Engineer - Experimental aig Cummins Inc.. Tuarastal bunasach meadhanach $88,156; leth meadhanach $87,464–$94,796.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$88,156
Leath mheadhanach nan tuarastalan$87,464–$94,796
Ceudail 10mh–90mh$85,875–$96,304

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$96,304
FY20253$87,464
FY20261$93,288

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$93,288–$115,200
Ìre II
Seymour, IN28 Cèit 20268 Ògmh 2026Dearbhaichte
$87,464–$114,000
Ìre II
Seymour, IN14 Cèit 20251 Dàmh 2025Dearbhaichte
$87,464–$114,000
Ìre II
Seymour, IN13 Cèit 20251 Dàmh 2025Dearbhaichte
$88,156–$114,000Fridley, MN27 Màrt 202523 Sult 2025Dearbhaichte
$83,491–$114,000
Ìre I
Columbus, IN1 Ògmh 20241 Dàmh 2024Dearbhaichte
$96,304–$114,000
Ìre II
Seymour, IN20 Samh 202317 Cèit 2024Dearbhaichte
$96,304–$114,000
Ìre II
Seymour, IN8 Samh 20238 Cèit 2024Dearbhaichte

Obraichean eile aig Cummins Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).