Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cummins Inc. › VPI Program Manager

VPI Program Manager aig Cummins Inc.: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd VPI Program Manager aig Cummins Inc.. Tuarastal bunasach meadhanach $109,426; leth meadhanach $101,766–$109,892.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$109,426
Leath mheadhanach nan tuarastalan$101,766–$109,892
Ceudail 10mh–90mh$96,876–$112,699

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$104,946
FY20241$87,775
FY20251$110,365
FY20264$109,734

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$109,734–$133,200Indianapolis, IN5 Cèit 202631 Dàmh 2026Dearbhaichte
$118,144–$133,200
Ìre I
Columbus, IN30 Gibl 202628 Dàmh 2026Dearbhaichte
$109,734–$133,200Indianapolis, IN27 Gibl 202618 Cèit 2026Dearbhaichte
$102,096–$133,200Seymour, IN23 Gearr 20269 Màrt 2026Dearbhaichte
$110,365–$133,200
Ìre IV
Columbus, IN19 Lùna 202513 Gearr 2026Dearbhaichte
$87,775–$129,600Columbus, IN22 Lùna 202415 Gearr 2025Dearbhaichte
$87,775–$129,600Indianapolis, IN21 Lùna 202415 Gearr 2025Diùltadh
$109,117–$120,000
Ìre III
Columbus, IN3 Lùna 20231 Gearr 2024Dearbhaichte
$100,776–$104,160
Ìre IV
Columbus, IN7 Ògmh 202314 Ògmh 2023Dearbhaichte

Obraichean eile aig Cummins Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).