Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Cvent, Inc. › Lead SDET

Lead SDET aig Cvent, Inc.: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd Lead SDET aig Cvent, Inc.. Tuarastal bunasach meadhanach $127,584; leth meadhanach $125,838–$132,023.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$127,584
Leath mheadhanach nan tuarastalan$125,838–$132,023
Ceudail 10mh–90mh$120,204–$134,195

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$119,006
FY20242$132,023
FY20252$131,260
FY20261$126,676

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$126,676
Ìre II
Liberty Hill, TX23 Gibl 20261 Dàmh 2026Dearbhaichte
$127,584
Ìre III
Round Rock, TX28 Cèit 202529 Lùna 2025Dearbhaichte
$134,936
Ìre III
McLean Tysons Corner, VA20 Dùbh 20242 Ògmh 2025Dearbhaichte
$130,345
Ìre III
McLean, VA22 Faoi 202422 Iuch 2024Dearbhaichte
$130,345
Ìre III
McLean, VA22 Faoi 202422 Iuch 2024Air a tharraing air ais
$133,701
Ìre III
Lake Stevens, WA1 Dùbh 202329 Cèit 2024Dearbhaichte
$113,011
Ìre II
Hoschton, GA24 Màrt 202323 Lùna 2023Dearbhaichte
$125,000
Ìre III
Bayonne, NJ24 Faoi 20236 Gearr 2023Dearbhaichte

Lead SDET aig gach neach-fastaidh →

Obraichean eile aig Cvent, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).