Dachaigh › Luchd-obrach › Cvent, Inc. › Lead SDET
Lead SDET aig Cvent, Inc.: Tuarastalan H-1B
8 iarrtasan cumhaichean-obrach airson an dreuchd Lead SDET aig Cvent, Inc.. Tuarastal bunasach meadhanach $127,584; leth meadhanach $125,838–$132,023.
Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$127,584
Leath mheadhanach nan tuarastalan$125,838–$132,023
Ceudail 10mh–90mh$120,204–$134,195
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $119,006 |
| FY2024 | 2 | $132,023 |
| FY2025 | 2 | $131,260 |
| FY2026 | 1 | $126,676 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $126,676 Ìre II | Liberty Hill, TX | 23 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $127,584 Ìre III | Round Rock, TX | 28 Cèit 2025 | 29 Lùna 2025 | Dearbhaichte |
| $134,936 Ìre III | McLean Tysons Corner, VA | 20 Dùbh 2024 | 2 Ògmh 2025 | Dearbhaichte |
| $130,345 Ìre III | McLean, VA | 22 Faoi 2024 | 22 Iuch 2024 | Dearbhaichte |
| $130,345 Ìre III | McLean, VA | 22 Faoi 2024 | 22 Iuch 2024 | Air a tharraing air ais |
| $133,701 Ìre III | Lake Stevens, WA | 1 Dùbh 2023 | 29 Cèit 2024 | Dearbhaichte |
| $113,011 Ìre II | Hoschton, GA | 24 Màrt 2023 | 23 Lùna 2023 | Dearbhaichte |
| $125,000 Ìre III | Bayonne, NJ | 24 Faoi 2023 | 6 Gearr 2023 | Dearbhaichte |
Lead SDET aig gach neach-fastaidh →
Obraichean eile aig Cvent, Inc.
- Software Engineer II$113,964
- Senior Software Engineer$135,492
- Lead Software Engineer$163,824
- Principal SDET$142,743
- Senior SDET$110,245
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).