Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › DFS Corporate Services LLC › Senior Associate Infrastructure Engineer

Senior Associate Infrastructure Engineer aig DFS Corporate Services LLC: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Senior Associate Infrastructure Engineer aig DFS Corporate Services LLC. Tuarastal bunasach meadhanach $79,000; leth meadhanach $78,677–$85,551.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$79,000
Leath mheadhanach nan tuarastalan$78,677–$85,551
Ceudail 10mh–90mh$67,412–$98,861

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20232$67,000
FY20244$79,000
FY20261$88,102

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$88,102–$137,000
Ìre I
Riverwoods, IL10 Dùbh 202515 Dùbh 2025Dearbhaichte
$78,354–$121,100
Ìre II
Riverwoods, IL8 Gibl 202415 Gibl 2024Dearbhaichte
$79,000–$117,000
Ìre II
Riverwoods, IL23 Faoi 20245 Gearr 2024Dearbhaichte
$79,000–$110,000
Ìre II
Riverwoods, IL6 Dùbh 202318 Dùbh 2023Dearbhaichte
$115,000–$117,832
Ìre II
Riverwoods, IL10 Samh 202310 Cèit 2024Dearbhaichte
$83,000–$85,000
Ìre I
Riverwoods, IL1 Lùna 20237 Lùna 2023Dearbhaichte
$51,000–$123,932
Ìre I
Riverwoods, IL17 Faoi 20237 Iuch 2023Dearbhaichte

Obraichean eile aig DFS Corporate Services LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).