Dachaigh › Luchd-obrach › DLZ Corporation
DLZ Corporation: Tuarastalan H-1B agus taic bhìosa
Chuir DLZ Corporation 26 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 25. Tuarastal meadhanach a chaidh a thabhann: $76,000.
A bheil DLZ Corporation a’ toirt taic do bhìosaichean H-1B?
Chuir DLZ Corporation 26 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 9 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig DLZ Corporation: 3 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Civil Engineer II | 8 | $78,000 |
| Civil Engineer I | 6 | $63,000 |
| Structural Engineer I | 3 | $60,000 |
| Mechanical Engineer | 2 | $79,500 |
| Structural Engineer II | 2 | $78,250 |
| Structural Engineer IV | 1 | $115,000 |
| Civil Engineer | 1 | $91,000 |
| Surveyor I | 1 | $46,696 |
| Civil Engineer IV | 1 | $109,117 |
| Structural Engineeer II | 1 | $80,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 7 | $60,000 |
| FY2024 | 2 | $94,000 |
| FY2025 | 11 | $77,000 |
| FY2026 | 6 | $80,500 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Columbus, OH6
- Lansing, MI4
- Akron, OH3
- Waterford Township, MI3
- Chicago, IL3
- Indianapolis, IN2
- Cleveland, OH2
- Melvindale, MI2
- Dearborn, MI1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Structural Engineer II | $80,500–$95,500 Ìre II | Akron, OH | 9 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Civil Engineer I | $75,000–$90,000 Ìre I | Chicago, IL | 2 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Civil Engineer II | $80,829–$91,000 pàirt-àm · Ìre II | Dearborn, MI | 2 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Structural Engineeer II | $80,000–$90,000 Ìre II | Lansing, MI | 1 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Civil Engineer II | $81,000–$95,000 Ìre II | Akron, OH | 11 Màrt 2026 | 18 Màrt 2026 | Dearbhaichte |
| Mechanical Engineer | $102,000–$120,000 Ìre III | Indianapolis, IN | 7 Faoi 2026 | 14 Faoi 2026 | Dearbhaichte |
| Civil Engineer II | $77,000–$97,000 Ìre II | Melvindale, MI | 23 Gibl 2025 | 12 Cèit 2025 | Dearbhaichte |
| Surveyor I | $46,696–$57,000 Ìre I | Columbus, OH | 7 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Civil Engineer IV | $109,117–$120,000 Ìre IV | Columbus, OH | 7 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Civil Engineer I | $62,650–$72,000 Ìre I | Columbus, OH | 7 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Civil Engineer I | $63,000–$85,000 Ìre I | Melvindale, MI | 2 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Civil Engineer I | $71,000–$81,000 Ìre I | Chicago, IL | 2 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Civil Engineer I | $63,000–$85,000 Ìre I | Waterford Township, MI | 2 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Civil Engineer II | $79,000–$95,000 Ìre II | Columbus, OH | 2 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Civil Engineer | $91,000–$97,000 Ìre III | Waterford Township, MI | 10 Gearr 2025 | 2 Cèit 2025 | Dearbhaichte |
| Civil Engineer II | $78,000–$95,000 Ìre II | Cleveland, OH | 24 Faoi 2025 | 6 Ògmh 2025 | Dearbhaichte |
| Civil Engineer II | $79,000–$95,000 Ìre II | Columbus, OH | 18 Dùbh 2024 | 20 Faoi 2025 | Dearbhaichte |
| Structural Engineer IV | $115,000–$170,000 Ìre IV | Chicago, IL | 5 Ògmh 2024 | 24 Ògmh 2024 | Dearbhaichte |
| Civil Engineer II | $73,000–$95,000 Ìre II | Waterford Township, MI | 27 Samh 2023 | 1 Dùbh 2023 | Dearbhaichte |
| Structural Engineer I | $60,000–$80,000 Ìre I | Lansing, MI | 1 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Civil Engineer I | $60,000–$80,000 Ìre I | Lansing, MI | 1 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Structural Engineer I | $60,000–$80,000 Ìre I | Akron, OH | 1 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Structural Engineer I | $60,000–$80,000 Ìre I | Lansing, MI | 1 Gibl 2023 | 1 Dàmh 2023 | Air a tharraing air ais |
| Mechanical Engineer | $57,000–$100,000 Ìre I | Indianapolis, IN | 20 Gearr 2023 | 21 Lùna 2023 | Dearbhaichte |
| Civil Engineer II | $76,000–$90,000 Ìre II | Cleveland, OH | 25 Faoi 2023 | 1 Gearr 2023 | Dearbhaichte |
| Structural Engineer II | $76,000–$90,000 Ìre II | Columbus, OH | 19 Faoi 2023 | 6 Gearr 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).