Dachaigh › Luchd-obrach › Driftwood Capital LLC
Driftwood Capital LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Driftwood Capital LLC 7 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 6. Tuarastal meadhanach a chaidh a thabhann: $119,862.
A bheil Driftwood Capital LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Driftwood Capital LLC 7 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 12 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Engineer | 4 | $119,725 |
| Manager of Analytics | 2 | $152,625 |
| Investment Analyst | 1 | $87,975 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 4 | $119,725 |
| FY2025 | 1 | $155,250 |
| FY2026 | 2 | $103,988 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Project Engineer | $120,000 Ìre III | Coral Gables, FL | 12 Ògmh 2026 | 30 Sult 2026 | Dearbhaichte |
| Investment Analyst | $87,975 Ìre III | Coral Gables, FL | 17 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Manager of Analytics | $155,250 Ìre IV | Miami, FL | 14 Màrt 2025 | 18 Màrt 2025 | Dearbhaichte |
| Manager of Analytics | $150,000 Ìre IV | Miami, FL | 8 Màrt 2024 | 18 Màrt 2024 | Dearbhaichte |
| Project Engineer | $119,725–$155,000 Ìre IV | Coral Gables, FL | 18 Dàmh 2023 | 23 Dàmh 2023 | Dearbhaichte |
| Project Engineer | $115,000 Ìre III | Coral Gables, FL | 17 Dàmh 2023 | 23 Dàmh 2023 | Air a tharraing air ais |
| Project Engineer | $76,648–$76,800 Ìre II | Coral Gables, FL | 20 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).