Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › East West Bank › Lead Applications Developer

Lead Applications Developer aig East West Bank: Tuarastalan H-1B

9 iarrtasan cumhaichean-obrach airson an dreuchd Lead Applications Developer aig East West Bank. Tuarastal bunasach meadhanach $181,861; leth meadhanach $176,051–$199,537.

Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$181,861
Leath mheadhanach nan tuarastalan$176,051–$199,537
Ceudail 10mh–90mh$174,892–$209,383

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20242$190,592
FY20256$181,861

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$180,162
Ìre III
El Monte, CA2 Sult 202526 Faoi 2026Dearbhaichte
$175,275
Ìre III
El Monte, CA5 Lùna 202519 Dùbh 2025Dearbhaichte
$176,310
Ìre III
El Monte, CA9 Iuch 202525 Samh 2025Dearbhaichte
$214,513
Ìre III
Palo Alto, CA23 Cèit 202518 Samh 2025Dearbhaichte
$196,988
Ìre II
Palo Alto, CA11 Gibl 20251 Dàmh 2025Dearbhaichte
$183,560
Ìre IV
El Monte, CA14 Màrt 20252 Sult 2025Dearbhaichte
$207,185
Ìre II
Palo Alto, CA11 Faoi 202421 Ògmh 2024Dearbhaichte
$207,185
Ìre II
Palo Alto, CA10 Faoi 202421 Ògmh 2024Air a tharraing air ais
$174,000
Ìre III
El Monte, CA8 Samh 202316 Gibl 2024Dearbhaichte

Lead Applications Developer aig gach neach-fastaidh →

Obraichean eile aig East West Bank

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).