Dachaigh › Luchd-obrach › Eaton Corporation › Senior Embedded Firmware Engineer
Senior Embedded Firmware Engineer aig Eaton Corporation: Tuarastalan H-1B
5 iarrtasan cumhaichean-obrach airson an dreuchd Senior Embedded Firmware Engineer aig Eaton Corporation. Tuarastal bunasach meadhanach $113,850; leth meadhanach $109,675–$114,425.
Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$113,850
Leath mheadhanach nan tuarastalan$109,675–$114,425
Ceudail 10mh–90mh$107,170–$114,770
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 1 | $113,850 |
| FY2026 | 2 | $110,250 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $115,000–$135,000 Ìre II | Raleigh, NC | 5 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $115,000–$135,000 Ìre II | Raleigh, NC | 28 Cèit 2026 | 1 Dàmh 2026 | Air a tharraing air ais |
| $115,000–$135,000 Ìre II | Raleigh, NC | 27 Cèit 2026 | 1 Dàmh 2026 | Air a tharraing air ais |
| $105,500 Ìre I | Raleigh, NC | 10 Dùbh 2025 | 13 Dùbh 2025 | Dearbhaichte |
| $113,850 Ìre II | Raleigh, NC | 2 Iuch 2025 | 19 Sult 2025 | Dearbhaichte |
Obraichean eile aig Eaton Corporation
- Lead Engineer$120,000
- Electrical Engineer$87,860
- Mechanical Engineer$80,716
- Senior Manufacturing Engineer$96,340
- Manufacturing Engineer$81,276
- Power Electronics Engineer$113,728
- Software Engineer$104,000
- Engineering Manager$141,208
- Senior Electrical Engineer$104,500
- Lead Power Electronics Engineer$125,870
- Specialist Engineer$137,000
- Lead Firmware Engineer$130,624
- Senior Engineer$105,000
- Embedded Systems Engineer$104,000
- Embedded Systems Engineer Leadership Development Participant$111,662
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).