Dachaigh › Luchd-obrach › ECS Florida, LLC
ECS Florida, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir ECS Florida, LLC 18 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 18. Tuarastal meadhanach a chaidh a thabhann: $70,699.
A bheil ECS Florida, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir ECS Florida, LLC 18 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 13 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig ECS Florida, LLC: 4 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Construction Materials Staff Project Manager | 4 | $59,946 |
| CMT Staff Project Manager | 3 | $69,992 |
| CMT Staff Project Manager 1 | 2 | $61,710 |
| CMT Project Manager | 1 | $71,989 |
| Construction Materials Project Manager | 1 | $71,552 |
| Geotechnical Project Manager | 1 | $79,019 |
| Facilities Office Manager | 1 | $135,000 |
| Geotechnical Project Manager II | 1 | $90,002 |
| Project Engineer | 1 | $108,130 |
| Geotech Staff Project Manager I | 1 | $65,270 |
| CMT Project Manager II | 1 | $90,557 |
| Geotech Staff Project Manager | 1 | $71,406 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $71,552 |
| FY2024 | 7 | $67,210 |
| FY2025 | 6 | $77,636 |
| FY2026 | 2 | $72,623 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
- Civil Engineers15
- Materials Engineers1
- General and Operations Managers1
- Mining and Geological Engineers, Including Mining Safety Engineers1
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Geotech Staff Project Manager | $71,406 Ìre I | Sarasota, FL | 13 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| CMT Project Manager II | $90,557 Ìre II | Tampa, FL | 30 Ògmh 2025 | 31 Dàmh 2025 | Dearbhaichte |
| Project Engineer | $108,130 Ìre II | Tampa, FL | 20 Ògmh 2025 | 20 Sult 2025 | Dearbhaichte |
| Geotech Staff Project Manager I | $65,270 Ìre I | Tampa, FL | 1 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| CMT Staff Project Manager 1 | $61,693 Ìre I | Fort Myers, FL | 1 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| CMT Staff Project Manager 1 | $61,727 Ìre I | Fort Myers, FL | 15 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| CMT Staff Project Manager | $73,840 Ìre I | Tallahassee, FL | 16 Faoi 2025 | 10 Gearr 2025 | Dearbhaichte, an uair sin air a tharraing air ais |
| Geotechnical Project Manager II | $90,002 Ìre II | Tampa, FL | 7 Faoi 2025 | 9 Faoi 2025 | Dearbhaichte |
| Construction Materials Staff Project Manager | $67,210 Ìre I | Orlando, FL | 29 Cèit 2024 | 28 Dàmh 2024 | Dearbhaichte |
| Construction Materials Staff Project Manager | $56,805 Ìre I | Fort Myers, FL | 17 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Construction Materials Staff Project Manager | $62,400 Ìre I | Orlando, FL | 16 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Construction Materials Staff Project Manager | $57,491 Ìre I | Tallahassee, FL | 16 Gibl 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Geotechnical Project Manager | $79,019 Ìre II | Orlando, FL | 21 Gearr 2024 | 2 Lùna 2024 | Dearbhaichte |
| Facilities Office Manager | $135,000 Ìre III | Tampa, FL | 8 Gearr 2024 | 15 Gearr 2024 | Dearbhaichte |
| CMT Staff Project Manager | $69,992 Ìre I | Tampa, FL | 26 Sult 2023 | 4 Dàmh 2023 | Dearbhaichte |
| CMT Staff Project Manager | $69,628 Ìre I | Tampa, FL | 14 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Construction Materials Project Manager | $71,552 Ìre II | Fort Myers, FL | 22 Gearr 2023 | 17 Gibl 2023 | Dearbhaichte |
| CMT Project Manager | $71,989 Ìre I | Tampa, FL | 27 Dàmh 2022 | 31 Dàmh 2022 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).