Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Epitec, Inc. › Product Development Hardware-in-Loop (HIL) Engineer

Product Development Hardware-in-Loop (HIL) Engineer aig Epitec, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Product Development Hardware-in-Loop (HIL) Engineer aig Epitec, Inc.. Tuarastal bunasach meadhanach $92,560; leth meadhanach $89,440–$102,232.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$92,560
Leath mheadhanach nan tuarastalan$89,440–$102,232
Ceudail 10mh–90mh$88,192–$107,037

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20255$92,560

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$94,723
Ìre II
Allen Park, MI11 Cèit 20251 Dàmh 2025Air a tharraing air ais
$110,240
Ìre II
Allen Park, MI4 Sult 202418 Sult 2024Dearbhaichte, an uair sin air a tharraing air ais
$92,560
Ìre II
Allen Park, MI28 Lùna 20249 Sult 2024Dearbhaichte, an uair sin air a tharraing air ais
$89,440
Ìre II
Allen Park, MI27 Lùna 202416 Sult 2024Dearbhaichte, an uair sin air a tharraing air ais
$102,232
Ìre II
Allen Park, MI23 Lùna 20249 Sult 2024Dearbhaichte, an uair sin air a tharraing air ais
$87,360
Ìre I
Allen Park, MI25 Gibl 20241 Dàmh 2024Dearbhaichte, an uair sin air a tharraing air ais

Obraichean eile aig Epitec, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).