Dachaigh › Luchd-obrach › Evans General Contractors, LLC
Evans General Contractors, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Evans General Contractors, LLC 7 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 7. Tuarastal meadhanach a chaidh a thabhann: $72,238.
A bheil Evans General Contractors, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Evans General Contractors, LLC 7 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 19 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| VDC Project Engineer | 2 | $69,597 |
| Project Manager | 1 | $136,656 |
| VDC Assistant Manager | 1 | $74,360 |
| Project Engineer | 1 | $62,358 |
| Virtual Design Construction & Controls Project Engineer | 1 | $72,238 |
| Assistant Project Manager | 1 | $96,637 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 1 | $70,824 |
| FY2026 | 6 | $73,299 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Assistant Project Manager | $96,637–$119,953 Ìre II | Alpharetta, GA | 19 Cèit 2026 | 26 Cèit 2026 | Dearbhaichte |
| Virtual Design Construction & Controls Project Engineer | $72,238–$87,754 Ìre I | Charlotte, NC | 1 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| VDC Project Engineer | $68,370–$83,386 Ìre I | Alpharetta, GA | 30 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Engineer | $62,358–$81,431 Ìre I | Greenville, SC | 28 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| VDC Assistant Manager | $74,360–$95,117 Ìre I | Alpharetta, GA | 19 Gearr 2026 | 24 Gearr 2026 | Dearbhaichte |
| Project Manager | $136,656–$166,656 Ìre IV | Alpharetta, GA | 24 Samh 2025 | 24 Samh 2025 | Dearbhaichte |
| VDC Project Engineer | $70,824–$91,935 Ìre I | Alpharetta, GA | 6 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).