Dachaigh › Luchd-obrach › Exbon Development, Inc.
Exbon Development, Inc.: Tuarastalan H-1B agus taic bhìosa
Chuir Exbon Development, Inc. 16 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 15. Tuarastal meadhanach a chaidh a thabhann: $79,000.
A bheil Exbon Development, Inc. a’ toirt taic do bhìosaichean H-1B?
Chuir Exbon Development, Inc. 16 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 30 Gibl 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig Exbon Development, Inc.: 5 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Engineer | 16 | $79,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $75,761 |
| FY2024 | 4 | $75,000 |
| FY2025 | 7 | $84,000 |
| FY2026 | 3 | $76,211 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Project Engineer | $76,211 Ìre I | Garden Grove, CA | 30 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Engineer | $76,211 Ìre I | Garden Grove, CA | 30 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Engineer | $100,000 Ìre I | Garden Grove, CA | 2 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Engineer | $96,000 Ìre I | Garden Grove, CA | 12 Sult 2025 | 1 Màrt 2026 | Dearbhaichte |
| Project Engineer | $85,000 Ìre I | Garden Grove, CA | 8 Sult 2025 | 1 Màrt 2026 | Air a tharraing air ais |
| Project Engineer | — Ìre I | Garden Grove, CA | 23 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer | $79,000 Ìre I | Garden Grove, CA | 23 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer | $88,000 Ìre I | Garden Grove, CA | 23 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer | — Ìre I | Garden Grove, CA | 23 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer | $80,000–$100,000 Ìre I | Garden Grove, CA | 21 Cèit 2025 | 11 Sult 2025 | Dearbhaichte |
| Project Engineer | $80,000 Ìre I | Garden Grove, CA | 9 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $75,000 Ìre I | Garden Grove, CA | 2 Gibl 2024 | 1 Ògmh 2024 | Dearbhaichte |
| Project Engineer | $75,000 Ìre I | Garden Grove, CA | 2 Gibl 2024 | 1 Ògmh 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| Project Engineer | $72,322 Ìre I | Garden Grove, CA | 26 Dàmh 2023 | 10 Samh 2023 | Dearbhaichte |
| Project Engineer | $72,322 Ìre I | Garden Grove, CA | 3 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Project Engineer | $79,200 Ìre I | Garden Grove, CA | 9 Gearr 2023 | 1 Màrt 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).