Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Exel, Inc. › Solutions Design Manager

Solutions Design Manager aig Exel, Inc.: Tuarastalan H-1B

7 iarrtasan cumhaichean-obrach airson an dreuchd Solutions Design Manager aig Exel, Inc.. Tuarastal bunasach meadhanach $109,254; leth meadhanach $104,000–$117,122.

Iarrtasan (LCAs)7
Tuarastal meadhanach a chaidh a thabhann$109,254
Leath mheadhanach nan tuarastalan$104,000–$117,122
Ceudail 10mh–90mh$104,000–$125,000

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20243$104,000
FY20253$111,245
FY20261$128,000

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$128,000
Ìre III
Goodyear, AZ11 Samh 202518 Samh 2025Dearbhaichte
$123,000
Ìre IV
Livonia, MI2 Sult 202515 Sult 2025Dearbhaichte
$111,245
Ìre III
Plano, TX28 Lùna 202510 Sult 2025Dearbhaichte
$104,000
Ìre III
Westerville, OH13 Gearr 202513 Lùna 2025Dearbhaichte
$109,254
Ìre II
Westerville, OH14 Cèit 20241 Dàmh 2024Dearbhaichte
$104,000
Ìre III
Westerville, OH1 Màrt 202430 Lùna 2024Dearbhaichte
$104,000
Ìre III
Westerville, OH4 Dùbh 202311 Cèit 2024Dearbhaichte

Obraichean eile aig Exel, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).