Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Farmers Group, Inc. › Solution Engineer

Solution Engineer aig Farmers Group, Inc.: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd Solution Engineer aig Farmers Group, Inc.. Tuarastal bunasach meadhanach $168,232; leth meadhanach $155,685–$168,267.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$168,232
Leath mheadhanach nan tuarastalan$155,685–$168,267
Ceudail 10mh–90mh$152,214–$174,867

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20265$168,232

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$179,267
Ìre IV
Woodland Hills, CA19 Cèit 202614 Dàmh 2026Dearbhaichte
$179,267
Ìre IV
Woodland Hills, CA18 Cèit 202614 Dàmh 2026Air a tharraing air ais
$168,232
Ìre III
Phoenix, AZ26 Gearr 20262 Lùna 2026Dearbhaichte
$155,685
Ìre II
Woodland Hills, CA10 Gearr 202622 Iuch 2026Dearbhaichte
$149,900
Ìre III
Kennesaw, GA4 Dùbh 202511 Dùbh 2025Dearbhaichte
$168,267
Ìre IV
Kansas City, KS3 Samh 202526 Gibl 2026Dearbhaichte

Solution Engineer aig gach neach-fastaidh →

Obraichean eile aig Farmers Group, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).