Dachaigh › Luchd-obrach › Fechko Excavating, LLC
Fechko Excavating, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Fechko Excavating, LLC 5 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 5. Tuarastal meadhanach a chaidh a thabhann: $86,445.
A bheil Fechko Excavating, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Fechko Excavating, LLC 5 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 16 Dàmh 2024. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Senior Estimator - Project Manager | 2 | $88,744 |
| Project Manager | 2 | $75,088 |
| Senior Estimator and Project Manager | 1 | $91,042 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2024 | 2 | $81,516 |
| FY2025 | 2 | $91,042 |
| FY2026 | 1 | $73,590 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Senior Estimator and Project Manager | $91,042–$175,000 Ìre IV | Medina, OH | 16 Dàmh 2024 | 25 Màrt 2025 | Dearbhaichte |
| Senior Estimator - Project Manager | $91,042–$110,000 Ìre IV | Medina, OH | 25 Sult 2024 | 21 Samh 2024 | Dearbhaichte |
| Project Manager | $73,590–$75,000 Ìre III | Medina, OH | 9 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| Project Manager | $76,586–$90,000 Ìre II | Medina, OH | 9 Gearr 2024 | 20 Gearr 2024 | Dearbhaichte, an uair sin air a tharraing air ais |
| Senior Estimator - Project Manager | $86,445–$110,000 Ìre IV | Medina, OH | 4 Dàmh 2023 | 29 Gearr 2024 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).