Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › FedEx Freight, Inc. › Full Stack Developer II

Full Stack Developer II aig FedEx Freight, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Full Stack Developer II aig FedEx Freight, Inc.. Tuarastal bunasach meadhanach $97,386; leth meadhanach $97,386–$102,416.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$97,386
Leath mheadhanach nan tuarastalan$97,386–$102,416
Ceudail 10mh–90mh$94,458–$130,510

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20265$97,386

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$92,506
Ìre II
Bloomington, IN16 Gibl 20261 Dàmh 2026Dearbhaichte
$97,386–$102,386
Ìre II
Memphis, TN30 Dùbh 20251 Gearr 2026Dearbhaichte
$149,240–$154,240
Ìre II
Kent, WA23 Dùbh 20251 Gearr 2026Dearbhaichte
$102,416–$107,416Lewisville, TX23 Dùbh 20251 Gearr 2026Dearbhaichte
$97,386–$102,390
Ìre II
Memphis, TN18 Dùbh 20251 Gearr 2026Dearbhaichte

Full Stack Developer II aig gach neach-fastaidh →

Obraichean eile aig FedEx Freight, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).