Dachaigh › Luchd-obrach › Ferrovial Construction US Corp.
Ferrovial Construction US Corp.: Tuarastalan H-1B agus taic bhìosa
Chuir Ferrovial Construction US Corp. 11 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 11. Tuarastal meadhanach a chaidh a thabhann: $105,000.
A bheil Ferrovial Construction US Corp. a’ toirt taic do bhìosaichean H-1B?
Chuir Ferrovial Construction US Corp. 11 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 3 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Estimator | 2 | $118,500 |
| Design Engineer | 1 | $78,562 |
| MOT Design Engineer | 1 | $120,000 |
| Civil Design Engineer | 1 | $73,830 |
| Cost Control Engineer | 1 | $117,500 |
| Project Engineer | 1 | $105,000 |
| Structures Project Engineer | 1 | $106,692 |
| Structures Engineer in Training (EIT) | 1 | $80,000 |
| Roadway Engineer in Training | 1 | $76,000 |
| Structural Engineer in Training | 1 | $73,000 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $107,000 |
| FY2024 | 1 | $73,830 |
| FY2025 | 4 | $105,846 |
| FY2026 | 3 | $76,000 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Structural Engineer in Training | $73,000 Ìre I | Atlanta, GA | 3 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Roadway Engineer in Training | $76,000–$79,000 Ìre I | Sandy Springs, GA | 3 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Estimator | $130,000 Ìre III | Austin, TX | 13 Gibl 2026 | 20 Gibl 2026 | Dearbhaichte |
| Cost Control Engineer | $117,500 Ìre IV | Atlanta, GA | 15 Sult 2025 | 29 Sult 2025 | Dearbhaichte |
| Project Engineer | $105,000 Ìre III | Atlanta, GA | 9 Sult 2025 | 15 Sult 2025 | Dearbhaichte |
| Structures Project Engineer | $106,692 Ìre II | Austin, TX | 15 Lùna 2025 | 25 Lùna 2025 | Dearbhaichte |
| Structures Engineer in Training (EIT) | $80,000 Ìre I | Atlanta, GA | 12 Lùna 2025 | 18 Lùna 2025 | Dearbhaichte |
| Civil Design Engineer | $73,830–$96,768 Ìre I | Austin, TX | 28 Ògmh 2024 | 28 Sult 2024 | Dearbhaichte |
| Estimator | $107,000 Ìre II | Austin, TX | 22 Sult 2023 | 26 Sult 2023 | Dearbhaichte |
| Design Engineer | $78,562–$141,960 Ìre II | Austin, TX | 17 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte |
| MOT Design Engineer | $120,000 Ìre I | Austin, TX | 11 Iuch 2023 | 1 Lùna 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).