Dachaigh › Luchd-obrach › Fidelity Technology Group, LLC d/b/a Fidelity Investments › Director, Full Stack Engineering
Director, Full Stack Engineering aig Fidelity Technology Group, LLC d/b/a Fidelity Investments: Tuarastalan H-1B
130 iarrtasan cumhaichean-obrach airson an dreuchd Director, Full Stack Engineering aig Fidelity Technology Group, LLC d/b/a Fidelity Investments. Tuarastal bunasach meadhanach $161,741; leth meadhanach $156,998–$164,311.
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 43 | $163,064 |
| FY2026 | 85 | $161,741 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $139,027–$173,400 Ìre IV | Covington, KY | 23 Ògmh 2026 | 19 Dùbh 2026 | Dearbhaichte |
| $157,187–$193,825 | Durham, NC | 23 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $157,187–$189,600 | Durham, NC | 23 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $139,027–$175,475 Ìre IV | Covington, KY | 22 Ògmh 2026 | 2 Dùbh 2026 | Dearbhaichte |
| $149,162–$173,025 | Durham, NC | 22 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $161,741–$191,725 Ìre IV | Durham, NC | 22 Ògmh 2026 | 10 Dùbh 2026 | Dearbhaichte |
| $161,741–$190,725 Ìre IV | Durham, NC | 22 Ògmh 2026 | 1 Dùbh 2026 | Dearbhaichte |
| $169,986–$187,625 | Smithfield, RI | 22 Ògmh 2026 | 13 Iuch 2026 | Dearbhaichte |
| $169,986–$187,625 | Merrimack, NH | 22 Ògmh 2026 | 22 Ògmh 2026 | Dearbhaichte |
| $161,741–$192,200 Ìre IV | Durham, NC | 22 Ògmh 2026 | 12 Dùbh 2026 | Dearbhaichte |
| $156,998–$180,950 Ìre IV | Westlake, TX | 19 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $139,027–$173,800 Ìre IV | Covington, KY | 19 Ògmh 2026 | 2 Dùbh 2026 | Dearbhaichte |
| $163,503–$189,725 | Westlake, TX | 19 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $157,187–$193,325 | Durham, NC | 18 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $156,998–$180,775 Ìre IV | Westlake, TX | 18 Ògmh 2026 | 2 Dùbh 2026 | Dearbhaichte |
| $163,552–$178,300 | Smithfield, RI | 17 Ògmh 2026 | 22 Ògmh 2026 | Dearbhaichte |
| $164,311–$188,625 | Westlake, TX | 17 Ògmh 2026 | 6 Iuch 2026 | Dearbhaichte |
| $157,187–$193,825 | Durham, NC | 17 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $156,998–$181,400 Ìre IV | Westlake, TX | 17 Ògmh 2026 | 30 Samh 2026 | Dearbhaichte |
| $169,299–$192,025 | Merrimack, NH | 16 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $156,998–$188,675 Ìre IV | Westlake, TX | 16 Ògmh 2026 | 22 Ògmh 2026 | Dearbhaichte |
| $164,311–$183,700 | Westlake, TX | 15 Ògmh 2026 | 22 Ògmh 2026 | Dearbhaichte |
| $161,741–$191,250 Ìre IV | Durham, NC | 15 Ògmh 2026 | 3 Dùbh 2026 | Dearbhaichte |
| $161,741–$189,175 Ìre IV | Durham, NC | 14 Ògmh 2026 | 10 Dùbh 2026 | Dearbhaichte |
| $178,131–$191,325 Ìre IV | Boston, MA | 14 Ògmh 2026 | 10 Dùbh 2026 | Dearbhaichte |
| $163,552–$178,300 | Smithfield, RI | 12 Ògmh 2026 | 22 Ògmh 2026 | Dearbhaichte |
| $156,998–$187,625 Ìre IV | Westlake, TX | 11 Ògmh 2026 | 29 Ògmh 2026 | Dearbhaichte |
| $157,187–$182,750 | Durham, NC | 9 Ògmh 2026 | 2 Dùbh 2026 | Dearbhaichte |
| $161,741–$189,725 Ìre IV | Durham, NC | 8 Ògmh 2026 | 2 Dùbh 2026 | Dearbhaichte |
| $161,741–$188,475 Ìre IV | Durham, NC | 8 Ògmh 2026 | 24 Samh 2026 | Dearbhaichte |
| $155,593–$182,500 Ìre IV | Smithfield, RI | 8 Ògmh 2026 | 3 Dùbh 2026 | Dearbhaichte |
| $161,741–$190,000 Ìre IV | Durham, NC | 8 Ògmh 2026 | 5 Dùbh 2026 | Dearbhaichte |
| $161,741–$187,000 Ìre IV | Durham, NC | 5 Ògmh 2026 | 3 Dùbh 2026 | Dearbhaichte |
| $161,741–$187,275 Ìre IV | Durham, NC | 5 Ògmh 2026 | 6 Iuch 2026 | Dearbhaichte |
| $157,187–$189,725 | Durham, NC | 5 Ògmh 2026 | 6 Iuch 2026 | Dearbhaichte |
| $157,187–$185,475 | Durham, NC | 5 Ògmh 2026 | 15 Ògmh 2026 | Dearbhaichte |
| $157,187–$182,000 | Durham, NC | 5 Ògmh 2026 | 15 Ògmh 2026 | Dearbhaichte |
| $157,187–$180,000 | Durham, NC | 3 Ògmh 2026 | 22 Ògmh 2026 | Dearbhaichte |
| $157,187–$180,000 | Durham, NC | 3 Ògmh 2026 | 22 Ògmh 2026 | Air a tharraing air ais |
| $157,187–$183,525 | Durham, NC | 2 Ògmh 2026 | 2 Ògmh 2026 | Dearbhaichte |
| $161,741–$178,725 Ìre IV | Durham, NC | 2 Ògmh 2026 | 1 Dùbh 2026 | Dearbhaichte |
| $178,500–$188,500 | Boston, MA | 29 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $161,741–$188,625 Ìre IV | Durham, NC | 27 Cèit 2026 | 13 Samh 2026 | Dearbhaichte |
| $157,187–$187,500 | Durham, NC | 26 Cèit 2026 | 1 Ògmh 2026 | Dearbhaichte |
| $169,299–$189,300 | Boston, MA | 21 Cèit 2026 | 16 Dàmh 2026 | Dearbhaichte |
| $169,299–$180,575 | Merrimack, NH | 21 Cèit 2026 | 1 Ògmh 2026 | Dearbhaichte |
| $163,400–$173,400 Ìre IV | Salt Lake City, UT | 17 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $169,986–$180,575 | Boston, MA | 14 Cèit 2026 | 13 Samh 2026 | Dearbhaichte |
| $157,187–$185,650 | Durham, NC | 13 Cèit 2026 | 25 Cèit 2026 | Dearbhaichte |
| $161,741–$189,725 Ìre IV | Durham, NC | 8 Cèit 2026 | 5 Samh 2026 | Dearbhaichte |
| $157,187–$186,450 | Durham, NC | 5 Cèit 2026 | 11 Cèit 2026 | Dearbhaichte |
| $178,131–$190,000 Ìre IV | Smithfield, RI | 5 Cèit 2026 | 11 Cèit 2026 | Dearbhaichte |
| $161,741–$191,741 Ìre IV | Durham, NC | 30 Gibl 2026 | 9 Dàmh 2026 | Dearbhaichte |
| $156,998–$185,000 E-3 · Ìre IV | Westlake, TX | 22 Gibl 2026 | 11 Cèit 2026 | Dearbhaichte |
| $178,131–$190,000 Ìre IV | Smithfield, RI | 21 Gibl 2026 | 4 Cèit 2026 | Dearbhaichte |
| $161,741–$188,250 Ìre IV | Durham, NC | 16 Gibl 2026 | 25 Sult 2026 | Dearbhaichte |
| $161,741–$186,450 Ìre IV | Durham, NC | 16 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $161,741–$188,250 Ìre IV | Durham, NC | 10 Gibl 2026 | 27 Gibl 2026 | Dearbhaichte |
| $157,187–$189,500 | Durham, NC | 31 Màrt 2026 | 19 Iuch 2026 | Dearbhaichte |
| $161,741–$178,000 Ìre IV | Durham, NC | 30 Màrt 2026 | 20 Gibl 2026 | Dearbhaichte |
| $157,187–$186,875 | Durham, NC | 20 Màrt 2026 | 13 Gibl 2026 | Dearbhaichte |
| $161,741–$189,725 Ìre IV | Durham, NC | 16 Màrt 2026 | 11 Sult 2026 | Dearbhaichte |
| $161,741–$189,725 Ìre IV | Durham, NC | 10 Màrt 2026 | 15 Iuch 2026 | Dearbhaichte |
| $155,593–$176,000 | Boston, MA | 28 Faoi 2026 | 1 Gearr 2026 | Dearbhaichte |
| $162,936–$189,725 | Westlake, TX | 28 Faoi 2026 | 15 Iuch 2026 | Dearbhaichte |
| $161,741–$188,450 Ìre IV | Durham, NC | 27 Faoi 2026 | 29 Iuch 2026 | Dearbhaichte |
| $156,998–$180,950 Ìre IV | Westlake, TX | 22 Faoi 2026 | 26 Faoi 2026 | Dearbhaichte |
| $161,741–$182,500 Ìre IV | Durham, NC | 22 Faoi 2026 | 26 Faoi 2026 | Dearbhaichte |
| $161,741–$177,000 Ìre IV | Durham, NC | 21 Faoi 2026 | 21 Faoi 2026 | Dearbhaichte |
| $161,741–$188,450 Ìre IV | Durham, NC | 14 Faoi 2026 | 16 Iuch 2026 | Dearbhaichte |
| $161,741–$182,475 Ìre IV | Durham, NC | 9 Faoi 2026 | 12 Ògmh 2026 | Dearbhaichte |
| $156,998–$185,000 Ìre IV | Westlake, TX | 9 Faoi 2026 | 12 Faoi 2026 | Dearbhaichte |
| $161,741–$174,000 Ìre IV | Durham, NC | 6 Faoi 2026 | 12 Faoi 2026 | Dearbhaichte |
| $155,593–$176,000 | Boston, MA | 5 Faoi 2026 | 12 Faoi 2026 | Dearbhaichte |
| $161,741–$190,725 Ìre IV | Durham, NC | 5 Faoi 2026 | 12 Faoi 2026 | Dearbhaichte |
| $157,248–$167,500 pàirt-àm | Durham, NC | 2 Faoi 2026 | 2 Faoi 2026 | Dearbhaichte |
| $161,741–$177,000 Ìre IV | Durham, NC | 26 Dùbh 2025 | 1 Faoi 2026 | Dearbhaichte |
| $156,998–$174,025 Ìre IV | Westlake, TX | 18 Dùbh 2025 | 1 Faoi 2026 | Dearbhaichte |
| $161,741–$186,875 Ìre IV | Durham, NC | 18 Dùbh 2025 | 1 Faoi 2026 | Dearbhaichte |
| $156,998–$172,000 Ìre IV | Westlake, TX | 14 Dùbh 2025 | 1 Faoi 2026 | Dearbhaichte |
| $161,741–$177,000 Ìre IV | Durham, NC | 13 Dùbh 2025 | 29 Dùbh 2025 | Dearbhaichte |
| $156,998–$185,000 Ìre IV | Westlake, TX | 6 Samh 2025 | 24 Samh 2025 | Dearbhaichte |
| $156,998–$188,450 Ìre IV | Westlake, TX | 6 Samh 2025 | 8 Cèit 2026 | Dearbhaichte |
| $161,741–$188,450 Ìre IV | Durham, NC | 4 Samh 2025 | 24 Gibl 2026 | Dearbhaichte |
| $156,998–$183,650 Ìre IV | Westlake, TX | 3 Samh 2025 | 5 Cèit 2026 | Dearbhaichte |
| $158,974–$180,775 Ìre IV | Smithfield, RI | 30 Sult 2025 | 22 Màrt 2026 | Dearbhaichte |
| $161,741–$190,900 Ìre IV | Durham, NC | 26 Sult 2025 | 1 Faoi 2026 | Dearbhaichte |
| $161,741–$185,000 Ìre IV | Durham, NC | 19 Sult 2025 | 6 Dàmh 2025 | Dearbhaichte |
| $153,254–$168,000 Ìre IV | Salt Lake City, UT | 16 Sult 2025 | 29 Sult 2025 | Dearbhaichte |
| $156,998–$185,000 Ìre IV | Westlake, TX | 26 Lùna 2025 | 15 Sult 2025 | Dearbhaichte |
| $161,741–$180,000 Ìre IV | Durham, NC | 19 Lùna 2025 | 8 Sult 2025 | Dearbhaichte |
| $170,248–$185,000 Ìre IV | Merrimack, NH | 14 Lùna 2025 | 25 Lùna 2025 | Dearbhaichte |
| $157,212–$197,625 | Jersey City, NJ | 30 Iuch 2025 | 3 Faoi 2026 | Dearbhaichte |
| $152,402–$170,000 Ìre IV | Salt Lake City, UT | 30 Iuch 2025 | 25 Lùna 2025 | Dearbhaichte |
| $161,741–$187,175 Ìre IV | Durham, NC | 29 Iuch 2025 | 4 Lùna 2025 | Dearbhaichte |
| $170,386–$180,775 | Durham, NC | 16 Iuch 2025 | 28 Iuch 2025 | Dearbhaichte |
| $164,486–$180,000 Ìre IV | Durham, NC | 30 Ògmh 2025 | 21 Iuch 2025 | Dearbhaichte |
| $164,486–$188,450 Ìre IV | Durham, NC | 27 Ògmh 2025 | 25 Dùbh 2025 | Dearbhaichte |
| $164,486–$188,150 Ìre IV | Durham, NC | 25 Ògmh 2025 | 4 Lùna 2025 | Dearbhaichte |
| $170,386–$180,775 | Durham, NC | 25 Ògmh 2025 | 14 Iuch 2025 | Dearbhaichte |
| $164,486–$187,175 Ìre IV | Durham, NC | 12 Ògmh 2025 | 30 Ògmh 2025 | Dearbhaichte |
| $163,064–$180,000 | Merrimack, NH | 20 Cèit 2025 | 9 Ògmh 2025 | Dearbhaichte |
| $130,541–$174,800 Ìre IV | Covington, KY | 6 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $164,486–$183,500 Ìre IV | Durham, NC | 1 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $149,781–$180,500 Ìre IV | Westlake, TX | 30 Gibl 2025 | 12 Cèit 2025 | Dearbhaichte |
| $159,910–$180,775 Ìre IV | Merrimack, NH | 29 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $172,744–$193,875 Ìre IV | Boston, MA | 24 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $151,757–$180,000 E-3 · Ìre IV | Smithfield, RI | 21 Gibl 2025 | 5 Cèit 2025 | Dearbhaichte |
| $164,486–$184,250 Ìre IV | Durham, NC | 7 Màrt 2025 | 27 Ògmh 2025 | Dearbhaichte |
| $164,486–$184,075 Ìre IV | Durham, NC | 21 Gearr 2025 | 25 Màrt 2025 | Dearbhaichte |
| $144,955–$165,000 Ìre IV | Salt Lake City, UT | 19 Gearr 2025 | 3 Màrt 2025 | Dearbhaichte |
| $164,486–$178,000 Ìre IV | Durham, NC | 6 Gearr 2025 | 24 Gearr 2025 | Dearbhaichte |
| $164,486–$185,650 Ìre IV | Durham, NC | 3 Gearr 2025 | 3 Gearr 2025 | Dearbhaichte |
| $155,108–$173,000 | Durham, NC | 30 Faoi 2025 | 3 Gearr 2025 | Dearbhaichte |
| $149,781–$182,025 Ìre IV | Westlake, TX | 28 Faoi 2025 | 10 Gearr 2025 | Dearbhaichte |
| $164,486–$175,000 Ìre IV | Durham, NC | 24 Faoi 2025 | 3 Gearr 2025 | Dearbhaichte |
| $164,486–$180,000 Ìre IV | Durham, NC | 24 Faoi 2025 | 3 Gearr 2025 | Dearbhaichte |
| $149,781–$174,000 Ìre IV | Westlake, TX | 23 Faoi 2025 | 27 Faoi 2025 | Dearbhaichte |
| $149,781–$165,000 Ìre IV | Westlake, TX | 22 Faoi 2025 | 3 Gearr 2025 | Dearbhaichte |
| $164,486–$175,000 Ìre IV | Durham, NC | 20 Faoi 2025 | 27 Faoi 2025 | Dearbhaichte |
| $164,486–$175,000 Ìre IV | Durham, NC | 17 Faoi 2025 | 20 Faoi 2025 | Dearbhaichte |
| $149,781–$181,022 Ìre II | Durham, NC | 15 Faoi 2025 | 20 Faoi 2025 | Dearbhaichte |
| $164,486–$175,000 Ìre IV | Durham, NC | 12 Faoi 2025 | 20 Faoi 2025 | Dearbhaichte |
| $139,194–$183,400 Ìre IV | Brandon, FL | 11 Faoi 2025 | 27 Ògmh 2025 | Dearbhaichte |
| $150,550–$185,625 Ìre IV | Glen Allen, VA | 6 Faoi 2025 | 13 Ògmh 2025 | Dearbhaichte |
| $172,744–$185,000 Ìre IV | Durham, NC | 4 Faoi 2025 | 13 Faoi 2025 | Dearbhaichte |
| $149,781–$170,000 Ìre IV | Westlake, TX | 31 Dùbh 2024 | 6 Faoi 2025 | Dearbhaichte |
| $164,486–$182,000 Ìre IV | Durham, NC | 30 Dùbh 2024 | 13 Faoi 2025 | Dearbhaichte |
| $185,442–$199,150 | Jersey City, NJ | 26 Dùbh 2024 | 6 Faoi 2025 | Dearbhaichte |
| $149,781–$186,400 Ìre IV | Westlake, TX | 24 Dùbh 2024 | 30 Cèit 2025 | Dearbhaichte |
Director, Full Stack Engineering aig gach neach-fastaidh →
Obraichean eile aig Fidelity Technology Group, LLC d/b/a Fidelity Investments
- Senior Software Engineer/Developer$116,709
- Principal Software Engineer/Developer$132,080
- Senior Full Stack Engineer$113,547
- Principal Full Stack Engineer$141,170
- Principal Data Engineer$135,126
- Director, Software Engineering$161,741
- Senior Data Engineer$116,709
- Full Stack Engineer$94,182
- Principal Cloud Engineer$144,008
- Director, Architecture$161,741
- Senior Systems Analyst$105,693
- Senior Cloud Engineer$112,923
- Principal Systems Analyst$125,119
- Director, Cloud Engineering$161,741
- Software Engineer/Developer$94,182
- Senior Systems Engineer$105,997
- Senior Front End Developer$112,923
- Director, Data Engineering$157,187
- Director, IT Product Management$143,374
- Principal Systems Engineer$128,173
- Principal Database Administrator$125,119
- Principal Site Reliability Engineer$131,120
- Senior Mobile Developer$106,457
- Principal Software Engineer$129,500
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).