Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Fidelity Technology Group, LLC › Principal Site Reliability Engineer

Principal Site Reliability Engineer aig Fidelity Technology Group, LLC: Tuarastalan H-1B

26 iarrtasan cumhaichean-obrach airson an dreuchd Principal Site Reliability Engineer aig Fidelity Technology Group, LLC. Tuarastal bunasach meadhanach $121,222; leth meadhanach $120,328–$132,413.

Iarrtasan (LCAs)26
Tuarastal meadhanach a chaidh a thabhann$121,222
Leath mheadhanach nan tuarastalan$120,328–$132,413
Ceudail 10mh–90mh$113,108–$132,413

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY202311$120,786
FY202412$132,413
FY20251$121,263

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$121,263–$141,500Durham, NC4 Samh 202411 Samh 2024Dearbhaichte
$141,170–$164,486
Ìre III
Durham, NC10 Sult 202423 Sult 2024Dearbhaichte
$141,170–$164,486
Ìre III
Durham, NC9 Iuch 20243 Faoi 2025Dearbhaichte
$132,413–$154,482
Ìre III
Durham, NC20 Ògmh 20241 Iuch 2024Dearbhaichte
$132,413–$154,482
Ìre III
Durham, NC19 Gibl 20241 Dàmh 2024Dearbhaichte
$111,467–$130,416
Ìre III
Durham, NC17 Gibl 202429 Gibl 2024Dearbhaichte
$132,413–$154,482
Ìre III
Durham, NC1 Màrt 202411 Màrt 2024Dearbhaichte
$120,328–$162,475
Ìre III
Westlake, TX16 Gearr 202426 Gearr 2024Dearbhaichte
$120,328–$162,475
Ìre III
Westlake, TX14 Gearr 202426 Gearr 2024Dearbhaichte
$132,413–$154,482
Ìre III
Durham, NC24 Faoi 20245 Gearr 2024Dearbhaichte
$119,532–$131,200Merrimack, NH12 Faoi 202415 Faoi 2024Dearbhaichte
$132,413–$154,482
Ìre III
Durham, NC2 Faoi 20248 Faoi 2024Dearbhaichte
$120,328–$139,464
Ìre III
Westlake, TX22 Dùbh 202325 Dùbh 2023Dearbhaichte
$121,222–$141,003
Ìre III
Durham, NC22 Ògmh 20233 Iuch 2023Dearbhaichte
$121,222–$150,000
Ìre III
Durham, NC19 Gibl 202324 Gibl 2023Dearbhaichte
$120,786–$150,000
Ìre III
Durham, NC19 Gibl 202324 Gibl 2023Air a tharraing air ais
$120,786–$150,000
Ìre III
Durham, NC19 Gibl 202324 Gibl 2023Air a tharraing air ais
$120,786–$150,000
Ìre III
Durham, NC24 Màrt 202310 Gibl 2023Dearbhaichte
$110,157–$150,000
Ìre III
Greensboro, NC21 Màrt 202310 Gibl 2023Dearbhaichte
$106,018–$150,000
Ìre III
Covington, KY20 Màrt 202310 Gibl 2023Dearbhaichte
$120,786–$155,000
Ìre III
Durham, NC1 Màrt 202310 Gibl 2023Dearbhaichte
$121,222–$141,003
Ìre III
Durham, NC2 Gearr 20236 Gearr 2023Dearbhaichte
$116,938–$160,000
Ìre III
Westlake, TX22 Samh 20229 Faoi 2023Dearbhaichte
$120,786–$155,000
Ìre III
Durham, NC17 Samh 20225 Dùbh 2022Dearbhaichte
$130,666–$160,000
Ìre III
Westlake, TX11 Samh 202219 Dùbh 2022Dearbhaichte
$121,222–$141,003
Ìre III
Durham, NC11 Dàmh 202214 Samh 2022Dearbhaichte

Principal Site Reliability Engineer aig gach neach-fastaidh →

Obraichean eile aig Fidelity Technology Group, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).