Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › First Object Inc › SAP PO and CPI Consultant

SAP PO and CPI Consultant aig First Object Inc: Tuarastalan H-1B

6 iarrtasan cumhaichean-obrach airson an dreuchd SAP PO and CPI Consultant aig First Object Inc. Tuarastal bunasach meadhanach $108,500; leth meadhanach $107,044–$108,500.

Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$108,500
Leath mheadhanach nan tuarastalan$107,044–$108,500
Ceudail 10mh–90mh$100,287–$108,500

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$94,016
FY20255$108,500

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$108,500
Ìre II
Naperville, IL22 Lùna 20252 Sult 2025Dearbhaichte
$108,500
Ìre II
Naperville, IL22 Lùna 202530 Faoi 2026Dearbhaichte
$108,500
Ìre II
Naperville, IL13 Lùna 202530 Faoi 2026Dearbhaichte
$108,500
Ìre II
Naperville, IL13 Lùna 202513 Lùna 2025Dearbhaichte
$106,558
Ìre II
Naperville, IL16 Faoi 202521 Faoi 2025Dearbhaichte
$94,016
Ìre II
Hoffman Estates, IL31 Dàmh 202230 Faoi 2023Dearbhaichte

Obraichean eile aig First Object Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).