Dachaigh › Luchd-obrach › First Solar, Inc. › Engineer- Development II
Engineer- Development II aig First Solar, Inc.: Tuarastalan H-1B
16 iarrtasan cumhaichean-obrach airson an dreuchd Engineer- Development II aig First Solar, Inc.. Tuarastal bunasach meadhanach $105,602; leth meadhanach $105,602–$107,370.
Iarrtasan (LCAs)16
Tuarastal meadhanach a chaidh a thabhann$105,602
Leath mheadhanach nan tuarastalan$105,602–$107,370
Ceudail 10mh–90mh$98,520–$125,308
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 3 | $91,437 |
| FY2024 | 1 | $105,602 |
| FY2025 | 11 | $105,602 |
| FY2026 | 1 | $112,674 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $112,674–$115,000 Ìre IV | Perrysburg, OH | 18 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| $105,602–$112,000 Ìre III | Perrysburg, OH | 4 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $105,602–$132,000 Ìre III | Perrysburg, OH | 4 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $123,011–$132,000 Ìre IV | Perrysburg, OH | 22 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $105,602–$112,000 Ìre III | Perrysburg, OH | 22 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $105,602–$125,000 Ìre III | Perrysburg, OH | 15 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $105,602–$125,000 Ìre III | Perrysburg, OH | 15 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $105,602–$115,000 Ìre III | Perrysburg, OH | 15 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $105,602–$112,000 Ìre III | Perrysburg, OH | 8 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $105,602–$112,000 Ìre III | Perrysburg, OH | 7 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $127,606–$145,000 | Santa Clara, CA | 22 Dàmh 2024 | 28 Dàmh 2024 | Dearbhaichte |
| $105,602–$115,000 Ìre III | Perrysburg, OH | 25 Sult 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $105,602–$115,000 Ìre III | Perrysburg, OH | 5 Sult 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $91,437–$125,000 Ìre III | Perrysburg, OH | 1 Sult 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $136,739–$145,000 Ìre III | Santa Clara, CA | 23 Lùna 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $83,762–$100,000 Ìre III | Perrysburg, OH | 8 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
Obraichean eile aig First Solar, Inc.
- Engineer- Manufacturing I$67,517
- Engineer- Manufacturing I USA$67,517
- Analyst - IT III$94,058
- Engineer- Manufacturing II USA$85,800
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).