Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › FIS Management Services, LLC › Vice President, Design

Vice President, Design aig FIS Management Services, LLC: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Vice President, Design aig FIS Management Services, LLC. Tuarastal bunasach meadhanach $370,800; leth meadhanach $360,298–$370,800.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$370,800
Leath mheadhanach nan tuarastalan$360,298–$370,800
Ceudail 10mh–90mh$341,393–$370,800

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20252$349,795
FY20262$370,800

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$370,800–$552,400
Ìre IV
Jacksonville, FL30 Sult 20251 Dùbh 2025Dearbhaichte
$370,800–$552,400
Ìre IV
San Francisco, CA30 Sult 20251 Dùbh 2025Dearbhaichte
$370,800
Ìre IV
Jacksonville, FL30 Sult 20251 Dùbh 2025Air a tharraing air ais
$328,790–$552,400
Ìre IV
Seattle, WA8 Iuch 20251 Lùna 2025Dearbhaichte
$370,800
Ìre IV
Jacksonville, FL8 Iuch 20251 Lùna 2025Dearbhaichte

Obraichean eile aig FIS Management Services, LLC

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).