Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Flexon Technologies Inc › Technical Project Manager

Technical Project Manager aig Flexon Technologies Inc: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Technical Project Manager aig Flexon Technologies Inc. Tuarastal bunasach meadhanach $114,816; leth meadhanach $97,552–$114,816.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$114,816
Leath mheadhanach nan tuarastalan$97,552–$114,816
Ceudail 10mh–90mh$88,941–$133,286

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20241$97,552
FY20264$114,816

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$145,600
Ìre III
Elk Grove, CA18 Cèit 20261 Dàmh 2026Dearbhaichte
$114,816
Ìre II
Pleasanton, CA3 Gearr 20263 Gearr 2026Dearbhaichte
$114,816
Ìre II
Pleasanton, CA11 Faoi 202611 Faoi 2026Dearbhaichte
$83,200
Ìre I
Pleasanton, CA11 Faoi 202612 Faoi 2026Dearbhaichte
$97,552
Ìre II
Austin, TX17 Cèit 20241 Dàmh 2024Dearbhaichte

Technical Project Manager aig gach neach-fastaidh →

Obraichean eile aig Flexon Technologies Inc

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).