Dachaigh › Luchd-obrach › Fluor Enterprises, Inc. › Associate Project Controls Specialist II
Associate Project Controls Specialist II aig Fluor Enterprises, Inc.: Tuarastalan H-1B
6 iarrtasan cumhaichean-obrach airson an dreuchd Associate Project Controls Specialist II aig Fluor Enterprises, Inc.. Tuarastal bunasach meadhanach $84,298; leth meadhanach $81,262–$84,298.
Iarrtasan (LCAs)6
Tuarastal meadhanach a chaidh a thabhann$84,298
Leath mheadhanach nan tuarastalan$81,262–$84,298
Ceudail 10mh–90mh$80,250–$84,298
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2025 | 4 | $84,298 |
| FY2026 | 2 | $82,274 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $84,298 Ìre II | Houston, TX | 15 Dùbh 2025 | 19 Dùbh 2025 | Dearbhaichte |
| $80,250 Ìre II | Hillsboro, OR | 3 Samh 2025 | 17 Samh 2025 | Dearbhaichte |
| $84,298 Ìre II | Houston, TX | 6 Lùna 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $84,298 Ìre II | Houston, TX | 5 Ògmh 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $84,298 Ìre II | Houston, TX | 7 Cèit 2025 | 1 Dàmh 2025 | Dearbhaichte |
| $80,250 Ìre II | Lebanon, IN | 25 Màrt 2025 | 18 Sult 2025 | Dearbhaichte |
Obraichean eile aig Fluor Enterprises, Inc.
- Construction Engineer$84,000
- Construction Engineer I$81,760
- Design Engineer IV$152,000
- Principal Process/Specialty Engineer$183,251
- Construction Engineer II$85,000
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).