Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › Ford Motor Company › HIL Validation Engineer

HIL Validation Engineer aig Ford Motor Company: Tuarastalan H-1B

8 iarrtasan cumhaichean-obrach airson an dreuchd HIL Validation Engineer aig Ford Motor Company. Tuarastal bunasach meadhanach $105,630; leth meadhanach $99,888–$107,422.

Iarrtasan (LCAs)8
Tuarastal meadhanach a chaidh a thabhann$105,630
Leath mheadhanach nan tuarastalan$99,888–$107,422
Ceudail 10mh–90mh$99,867–$113,012

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20236$102,654
FY20241$112,070
FY20251$105,872

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$105,872–$148,020
Ìre II
Dearborn, MI19 Sult 202520 Màrt 2026Dearbhaichte
$112,070–$184,260
Ìre IV
Allen Park, MI30 Gibl 20242 Cèit 2024Dearbhaichte
$99,819–$133,860
Ìre IV
Allen Park, MI19 Iuch 202319 Iuch 2023Dearbhaichte
$105,420–$176,580
Ìre IV
Allen Park, MI27 Màrt 202310 Gibl 2023Dearbhaichte
$105,840–$177,120
Ìre IV
Dearborn, MI15 Màrt 202320 Màrt 2023Dearbhaichte
$115,211–$147,660
Ìre IV
Allen Park, MI27 Gearr 202327 Màrt 2023Dearbhaichte
$99,888–$147,660Dearborn, MI6 Gearr 202320 Màrt 2023Dearbhaichte
$99,888–$148,020Allen Park, MI3 Gearr 202320 Màrt 2023Dearbhaichte

HIL Validation Engineer aig gach neach-fastaidh →

Obraichean eile aig Ford Motor Company

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).