Dachaigh › Luchd-obrach › Forge Technologies Inc › Java Developer
Java Developer aig Forge Technologies Inc: Tuarastalan H-1B
9 iarrtasan cumhaichean-obrach airson an dreuchd Java Developer aig Forge Technologies Inc. Tuarastal bunasach meadhanach $98,946; leth meadhanach $89,253–$109,283.
Iarrtasan (LCAs)9
Tuarastal meadhanach a chaidh a thabhann$98,946
Leath mheadhanach nan tuarastalan$89,253–$109,283
Ceudail 10mh–90mh$81,469–$112,020
A rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 4 | $109,283 |
| FY2024 | 3 | $89,253 |
| FY2025 | 2 | $101,046 |
Iarrtasan
| Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|
| $79,123–$79,150 Ìre I | San Antonio, TX | 13 Dùbh 2024 | 23 Dùbh 2024 | Dearbhaichte |
| $122,970–$123,700 Ìre II | Burlington, MA | 30 Sult 2024 | 14 Dàmh 2024 | Dearbhaichte |
| $89,253–$89,260 Ìre I | Edison, NJ | 10 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $89,253–$89,260 Ìre I | Edison, NJ | 1 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $82,056–$82,100 Ìre I | Plano, TX | 20 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| $98,946–$116,000 Ìre II | Wallingford, CT | 27 Iuch 2023 | 7 Lùna 2023 | Dearbhaichte |
| $109,283–$109,300 Ìre II | Whippany, NJ | 19 Ògmh 2023 | 27 Ògmh 2023 | Dearbhaichte |
| $109,283 Ìre II | Edison, NJ | 8 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
| $109,283 Ìre II | Edison, NJ | 1 Ògmh 2023 | 1 Dàmh 2023 | Dearbhaichte |
Java Developer aig gach neach-fastaidh →
Obraichean eile aig Forge Technologies Inc
- Software Engineer$109,283
- Software Developer$109,283
- Java Full Stack Developer$109,283
- DevOps Engineer$115,918
- Business Analyst$91,666
- Application Developer$99,268
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).