Dachaigh › Luchd-obrach › Forgen, LLC
Forgen, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir Forgen, LLC 14 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 14. Tuarastal meadhanach a chaidh a thabhann: $83,255.
A bheil Forgen, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir Forgen, LLC 14 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 29 Cèit 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Project Engineer | 5 | $79,706 |
| Project Engineer I | 4 | $77,350 |
| Project Manager | 2 | $110,000 |
| Assistant Project Manager | 1 | $100,000 |
| Estimator II | 1 | $82,041 |
| Project Engineer II | 1 | $101,546 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 1 | $69,552 |
| FY2024 | 4 | $88,216 |
| FY2025 | 2 | $77,350 |
| FY2026 | 7 | $84,469 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
- Denton, TX3
- Houston, TX2
- Taylorville, IL1
- West Sacramento, CA1
- Gonzales, LA1
- Rocklin, CA1
- Port Arthur, TX1
- Centennial, CO1
- Cameron, LA1
- Donaldsonville, LA1
- South Bay, FL1
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Project Engineer I | $84,469 Ìre II | Denton, TX | 29 Cèit 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Engineer II | $101,546 Ìre III | South Bay, FL | 20 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Estimator II | $82,041 Ìre III | Houston, TX | 15 Gibl 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Project Manager | $110,000 Ìre II | Denton, TX | 1 Gibl 2026 | 3 Gibl 2026 | Dearbhaichte |
| Project Engineer | $79,706 Ìre I | Donaldsonville, LA | 6 Màrt 2026 | 16 Màrt 2026 | Dearbhaichte |
| Project Manager | $110,000 Ìre II | Denton, TX | 30 Dùbh 2025 | 5 Faoi 2026 | Dearbhaichte |
| Project Engineer I | $74,200 Ìre I | Cameron, LA | 29 Sult 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer I | $80,500 Ìre I | Centennial, CO | 24 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer I | $74,200 Ìre I | Port Arthur, TX | 24 Gibl 2025 | 1 Dàmh 2025 | Dearbhaichte |
| Project Engineer | $89,571 Ìre I | West Sacramento, CA | 6 Iuch 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Assistant Project Manager | $100,000 Ìre I | Gonzales, LA | 6 Iuch 2024 | 8 Iuch 2024 | Dearbhaichte |
| Project Engineer | $86,862 Ìre I | Rocklin, CA | 25 Ògmh 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $67,500 Ìre I | Houston, TX | 2 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Project Engineer | $69,552 Ìre I | Taylorville, IL | 13 Sult 2023 | 18 Sult 2023 | Dearbhaichte |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).