Dàta Tuarastail H-1B

Dachaigh › Luchd-obrach › The Gap, Inc. › Staff Engineer

Staff Engineer aig The Gap, Inc.: Tuarastalan H-1B

5 iarrtasan cumhaichean-obrach airson an dreuchd Staff Engineer aig The Gap, Inc.. Tuarastal bunasach meadhanach $147,500; leth meadhanach $138,750–$161,250.

Iarrtasan (LCAs)5
Tuarastal meadhanach a chaidh a thabhann$147,500
Leath mheadhanach nan tuarastalan$138,750–$161,250
Ceudail 10mh–90mh$127,500–$181,500

A rèir bliadhna ionmhais

Bliadhna mhaoineLCAsTuarastal meadhanach
FY20231$145,000
FY20241$120,000
FY20252$172,500

Iarrtasan

Tuarastal bunasachÀiteAir a chur a-steachCeann-latha tòiseachaidhInbhe
$150,000
Ìre III
Groveport, OH13 Màrt 20258 Sult 2025Dearbhaichte
$195,000Pleasanton, CA20 Gearr 202527 Ògmh 2025Dearbhaichte
$195,000Pleasanton, CA18 Gearr 202527 Ògmh 2025Diùltadh
$145,000
Ìre II
San Francisco, CA7 Sult 202219 Sult 2022Dearbhaichte, an uair sin air a tharraing air ais
$120,000
Ìre III
Groveport, OH17 Lùna 202229 Lùna 2022Dearbhaichte, an uair sin air a tharraing air ais

Staff Engineer aig gach neach-fastaidh →

Obraichean eile aig The Gap, Inc.

Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).