Dachaigh › Luchd-obrach › GCON Management Company, LLC
GCON Management Company, LLC: Tuarastalan H-1B agus taic bhìosa
Chuir GCON Management Company, LLC 9 iarrtasan cumha-obrach a-steach airson bhìosaichean H-1B agus bhìosaichean co-cheangailte ann am bliadhnaichean ionmhais 2023–2026; le teisteanas: 9. Tuarastal meadhanach a chaidh a thabhann: $87,194.
A bheil GCON Management Company, LLC a’ toirt taic do bhìosaichean H-1B?
Chuir GCON Management Company, LLC 9 iarrtasan cumha-obrach a-steach ann am bliadhnaichean ionmhais 2023–2026, an tè as ùire air a chur a-steach air 5 Ògmh 2026. Is e LCA a’ chiad cheum ann an iarrtas H-1B, mar sin tha an neach-fastaidh air taic a thoirt do luchd-obrach H-1B no air ullachadh airson sin a dhèanamh; cha gharantaich e taic airson dreuchd shònraichte sam bith. Thoir sùil air liostaichean obrach an neach-fastaidh fhèin.
Iarrtasan cairt uaine (PERM) aig GCON Management Company, LLC: 3 →
Tuarastalan a rèir tiotal obrach
| Tiotal dreuchd | LCAs | Tuarastal meadhanach |
|---|---|---|
| Assistant Project Manager | 5 | $96,866 |
| Project Engineer | 4 | $72,904 |
Iarrtasan a rèir bliadhna ionmhais
| Bliadhna mhaoine | LCAs | Tuarastal meadhanach |
|---|---|---|
| FY2023 | 2 | $91,396 |
| FY2024 | 3 | $74,818 |
| FY2025 | 2 | $90,480 |
| FY2026 | 2 | $94,474 |
Ìrean tuarastail làithreach
Suidhichidh Roinn an Obrach ceithir ìrean tuarastail làithreach airson gach dreuchd agus sgìre, bho Ìre I (inntrigeadh) gu Ìre IV (gu tur comasach). Taghaidh an neach-fastaidh an ìre a fhreagras ri riatanasan na h-obrach.
Far a bheil na h-obraichean
Dreuchdan
Iarrtasan as ùire
| Tiotal dreuchd | Tuarastal bunasach | Àite | Air a chur a-steach | Ceann-latha tòiseachaidh | Inbhe |
|---|---|---|---|---|---|
| Assistant Project Manager | $117,957–$165,000 Ìre III | Phoenix, AZ | 5 Ògmh 2026 | 1 Dàmh 2026 | Dearbhaichte |
| Assistant Project Manager | $96,866–$161,700 Ìre I | Santa Clara, CA | 6 Ògmh 2025 | 7 Samh 2025 | Dearbhaichte |
| Project Engineer | $74,818–$90,000 Ìre I | Phoenix, AZ | 29 Cèit 2024 | 1 Dàmh 2024 | Dearbhaichte |
| Assistant Project Manager | $97,594–$120,000 Ìre I | Santa Clara, CA | 22 Cèit 2024 | 7 Samh 2024 | Dearbhaichte |
| Assistant Project Manager | $87,194–$110,000 Ìre II | Phoenix, AZ | 16 Cèit 2023 | 1 Dàmh 2023 | Dearbhaichte |
| Project Engineer | $70,990–$90,000 Ìre I | Phoenix, AZ | 27 Gibl 2023 | 1 Dàmh 2023 | Dearbhaichte, an uair sin air a tharraing air ais |
| Assistant Project Manager | $95,597–$110,000 Ìre I | Santa Clara, CA | 15 Gearr 2023 | 5 Màrt 2023 | Dearbhaichte |
| Project Engineer | $70,990–$90,000 Ìre I | Chandler, AZ | 6 Sult 2022 | 7 Sult 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
| Project Engineer | $84,094–$97,222 Ìre III | Phoenix, AZ | 6 Ògmh 2022 | 1 Dàmh 2022 | Dearbhaichte, an uair sin air a tharraing air ais |
Is e na tuarastalan an ìre as ìsle den tuarastal a chaidh a thabhann air gach iarrtas, air an tionndadh gu suim bhliadhnail; cleachdaidh na staitistigean iarrtasan làn-aimsire le teisteanas a-mhàin. Chan eil LCA na aontachadh bhìosa agus faodaidh aon LCA còmhdach a dhèanamh air iomadh dreuchd. Stòr: Roinn an Obrach na SA, Dàta Foillseachaidh OFLC LCA, bliadhnaichean ionmhais 2023–2026 (co-dhùnadh as ùire 30 Ògmh 2026).